Teekay JV finalizes shipbuilding contracts for Yamal LNG project

Teekay LNG Partners LP, Hamilton, Bermuda, through a 50-50 joint venture with China LNG Shipping (Holdings) Ltd., has finalized shipbuilding contracts for six internationally flagged icebreaker LNG carriers for the Yamal LNG project, which lies on Northern Russia’s Yamal Peninsula (OGJ Online, May 15, 2014).

Under the agreements, the JV will build six 172,000-cu m ARC7 LNG carrier newbuilds to be constructed by Daewoo Shipbuilding & Marine Engineering Co. Ltd., South Korea, for a total fully built-up cost of $2.1 billion.

The vessels will be constructed with maximum 2.1-m icebreaking capabilities in both the forward and reverse direction.

Yamal LNG—a joint venture of Novatek (60%), Total SA (20%), and China National Petroleum Corp. (20%)—will consist of three LNG trains with a total expected capacity of 16.5 million tonnes/year of LNG and is currently slated to start-up in early-2018.

Related Articles

WINTER HITS U.S. INDUSTRY, STRAINS GAS SUPPLY

01/01/1990 A record breaking cold front before and during the weekend of Dec. 23 shut down several major refineries and petrochemical plants in the U.S. Gulf ...

TEX/CON, SPUN OFF FROM BP, UP AND RUNNING

01/01/1990 BP Exploration Western Hemisphere has spun off its U.S. Lower 48 onshore exploration/development and gas gathering, transportation, and marketing a...

SAMEDAN BUYS GULF OF MEXICO PRODUCTION

01/01/1990 Samedan Oil Corp. has expanded its inventory of producing leases in the Gulf of Mexico. The wholly owned subsidiary of Noble Affiliates Inc., Ardmo...

OIL FLOW RISING IN E. CHINA REGION

01/01/1990 Production is building from an oil producing area in the lower reaches of the Yangtze River in eastern China's Jiangsu Province. The northern J...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected