Catcher development approved offshore the UK

A group led by Premier Oil PLC has received government approval for development of three oil and gas fields in the Catcher area of the UK Central North Sea.

The group will drill 22 subsea wells—14 producers and 8 water injectors—in Catcher, Varadero, and Burgman fields for tieback to a floating production, storage, and offloading vessel leased from BW Offshore. Water depth in the area is about 300 ft.

Production will begin in mid-2017 and peak at about 50,000 b/d of oil. Reserves are estimated at 96 million boe.

Oil produced by the Catcher area fields will be loaded onto tankers from the FPSO. Natural gas will enter the Shell-Esso Gas and Liquids (SEGAL) system for transport to St. Fergus.

Premier, operator, holds a 50% interest in Blocks 28/9a and 28/10c. Cairn Energy PLC holds 30%, and MOL Group holds 20%.

Related Articles

Petrobras eyes Lapa field pipeline-heating

08/26/2014 Petroleo Brasileiro SA (Petrobras) will evaluate pipeline-heating systems for use in development of deepwater Lapa oil field in the Santos basin of...

Statoil: Aasta Hansteen gas development on schedule for 2017

08/26/2014 The Aasta Hansteen gas development in the northern Norwegian Sea is on schedule for production start-up in third quarter 2017, reported operator St...

CERI: Market access key to Canadian bitumen output

08/25/2014 Outcomes in two areas of critical uncertainty can mean a difference in Canadian bitumen production in 2030 of 1.7-1.8 million b/d, according to a s...

CNOOC starts up oil field in Pearl River Mouth basin

08/25/2014 CNOOC Ltd. reported that its Wenchang 13-6 oil field has started production. The field, which lies in 120 m of water west of the Pearl River Mouth ...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected