PDVSA shutters unit at El Palito for repairs

Petroleos de Venezuela SA (PDVSA) has shut down the fluid catalytic cracker (FCC) for repair work at its 126,900-b/d El Palito refinery near Pto. Cabello, Carabobo state.

The unit was taken off line for maintenance following the discovery of an internal fault in the cyclone system in the plant’s regenerator, according to PDVSA.

While the operator said work is under way to restore operations to the unit, a timeframe for repairs was not disclosed.

Operations elsewhere in the refinery remain normal, according to PDVSA.

During the maintenance shutdown at El Palito, ample inventories will prevent any disruptions in fuel supplies to the 11 states normally served by the refinery, PDVSA said.

Related Articles

MarkWest to expand processing, fractionation in Pennsylvania

08/26/2014 MarkWest Energy Partners LP, Denver, will expand midstream infrastructure at its Keystone complex in Butler County, Pa., the company said, to handl...

Turkmen plant to yield gasoline from gas

08/26/2014

Construction has begun at Ovadan-Depe near Ashgabad, Turkmenistan, on a 15,500-b/d plant that will make gasoline from natural gas.

Vietnam’s Dung Quat refinery wraps maintenance

08/26/2014 State-owned Petrovietnam has completed the second planned maintenance turnaround since 2011 at its 140,000-b/d Dung Quat refinery in Quang Ngai Pro...

Emission reductions under way at Moscow refinery

08/26/2014 Russian oil producer JSC Gazprom Neft is upgrading process furnaces and switching completely to gas from liquid fuels in an effort to reduce emissi...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected