West Chirag platform starts production off Azerbaijan

Azerbaijan International Operating Co. (AIOC) has started oil production from the West Chirag platform in the Azeri-Chirag-Gunashli (ACG) complex of fields offshore Azerbaijan in the Caspian Sea.

Flow began from a predrilled well, J05, at a rate not reported by BP PLC, the AIOC operator.

The platform, installed in 17 m of water between the Chirag and Deepwater Gunashli platforms, has design capacity to handle 183,000 b/d of oil. Gas export capacity is 285 MMscfd.

Oil is processed on the platform and flows through a new infield pipeline linked to an existing 30-in. subsea pipeline for transport to the Sangachal Terminal.

Related Articles

Angolan oil flow seen above 2 million b/d

08/20/2014

Angola will produce 2.1-2.2 million b/d of crude oil by 2016, predicts Moody’s Investors Service.

Lukoil’s West Qurna-2 field production tops 280,000 b/d

08/20/2014 OAO Lukoil issued an update on West Qurna-2 field in Iraq, saying its production has exceeded 280,000 b/d compared with 120,000 b/d when Lukoil sta...

Statoil shuts in production from Troll C platform in North Sea

08/20/2014 Statoil ASA has temporarily shut in production from its Troll C platform in the North Sea after inspectors detected corrosion damage in pipe connec...

AER strengthens air quality requirements for Peace River operators

08/19/2014 Addressing emissions and odors, Alberta Energy Regulator says it has strengthened requirements to capture casing and tank top gas from heavy oil an...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected