Liquefaction contracts let for Texas LNG terminal

FLNG Liquefaction LLC and FLNG Liquefaction 2 LLC have let contracts for construction engineering for planned LNG export from the LNG import terminal on Quintana Island near Freeport, Tex.

Recipients of the $2.5 billion in contracts are CB&I and Zachry Industrial Inc. for construction of two 4.4 million tonne/year LNG trains.

In 2012, CB&I and Zachry received front-end engineering and design contracts on the liquefaction terminal (OGJ Online, Feb. 17, 2012). The most recent award includes a “limited notice to proceed” on engineering and procurement while the project awaits governmental approvals.

Related Articles

WINTER HITS U.S. INDUSTRY, STRAINS GAS SUPPLY

01/01/1990 A record breaking cold front before and during the weekend of Dec. 23 shut down several major refineries and petrochemical plants in the U.S. Gulf ...

TEX/CON, SPUN OFF FROM BP, UP AND RUNNING

01/01/1990 BP Exploration Western Hemisphere has spun off its U.S. Lower 48 onshore exploration/development and gas gathering, transportation, and marketing a...

SAMEDAN BUYS GULF OF MEXICO PRODUCTION

01/01/1990 Samedan Oil Corp. has expanded its inventory of producing leases in the Gulf of Mexico. The wholly owned subsidiary of Noble Affiliates Inc., Ardmo...

OIL FLOW RISING IN E. CHINA REGION

01/01/1990 Production is building from an oil producing area in the lower reaches of the Yangtze River in eastern China's Jiangsu Province. The northern J...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected