Sinopec begins building Guangxi LNG terminal

China Petroleum & Chemical Corp. (Sinopec) has announced the start of construction on an LNG terminal at the southern port of Tieshan, Beihai City, Guangxi Province.

The 5 million tonne/year regasification terminal will be built in two phases: Phase 1, 3 million tpy; Phase 2, 2 million tpy.

Upon completion in 2014, the project will complement and support the second West-East gas pipeline and Sino-Burma pipeline, Sinopec said.

Related Articles

California lawmakers pass in-state gas system methane emissions bill

08/28/2014 The California Senate passed a bill aimed at curbing methane emissions from intrastate natural gas pipelines and local distribution systems. SB 137...

BG Group: Mzia DST supports potential hub development offshore Tanzania

08/27/2014 Results from the second drillstem test (DST) on the Mzia discovery on Block 1 offshore southern Tanzania indicated further support for a hub develo...

Dakota Gold to develop Bakken-Three Forks crude terminal

08/27/2014 Dakota Gold Transfer-Plaza LLC plans to develop a crude oil transload terminal in Mountrail County, ND. Sited on 350 acres in the eastern section o...

ExxonMobil Pipeline settles charges from 2012 Louisiana spill

08/27/2014 Exxon Pipeline Co. agreed to pay more than $1.4 million to resolve federal charges that a 2012 spill from the company’s North Line near Torbert, La...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected