China’s first FRSU receives approval

China National Offshore Oil Corp. (CNOOC) last month received approval from the National Development and Reform Commission for the country’s first LNG floating regasification and storage unit (FRSU), CNOOC reported on its web site.

The vessel will be moored in the Nanjiang area of the Tianjiin port on Bohai Bay. The 2.2-million tonne/year Phase 1 will cost nearly $5.9 billion and, besides the FRSU, include storage and pipelines. An 11-mile, 40-in. gas pipeline will extend between Tianjin Nanjiang port and Lingang Economic Zone.

Phase 2 will consist of a 6-million tpy land terminal (OGJ, Apr. 1, 2013, p. 90).

Contact Conglin Xu at conglinx@ogjonline.com.

Related Articles

California lawmakers pass in-state gas system methane emissions bill

08/28/2014 The California Senate passed a bill aimed at curbing methane emissions from intrastate natural gas pipelines and local distribution systems. SB 137...

BG Group: Mzia DST supports potential hub development offshore Tanzania

08/27/2014 Results from the second drillstem test (DST) on the Mzia discovery on Block 1 offshore southern Tanzania indicated further support for a hub develo...

Dakota Gold to develop Bakken-Three Forks crude terminal

08/27/2014 Dakota Gold Transfer-Plaza LLC plans to develop a crude oil transload terminal in Mountrail County, ND. Sited on 350 acres in the eastern section o...

ExxonMobil Pipeline settles charges from 2012 Louisiana spill

08/27/2014 Exxon Pipeline Co. agreed to pay more than $1.4 million to resolve federal charges that a 2012 spill from the company’s North Line near Torbert, La...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected