Talisman testing Kurdamir-3 well in Kurdistan, Iraq

A unit of Talisman Energy Inc., Calgary, has begun a cased-hole test program of the Oligocene reservoir at the Kurdamir-3 well on the Kurdamir block in the Kurdistan Region of Iraq.

Talisman (Block K44) BV drilled the well to 2,895 m about 5 km southwest and downdip of the Kurdamir-2 well in what the block coventurers interpret to be a thicker portion of the Oligocene reservoir. The Kurdamir-3 well penetrated the oil column without encountering the gas cap, said partner WesternZagros Resources Ltd., Calgary.

Talisman recorded oil shows and supportive log data indicative of oil over the majority of the Kurdamir-3 Oligocene section penetrated. The Oligocene comprises a gross interval of 372 m of naturally fractured marlstones and dolomitic limestones including an interpreted 194 m of porous reservoir interval.

By comparison, the Kurdamir-2 well penetrated a gross interval of 300 m of which 140 m comprises the Oligocene porous interval. Coring and wireline logging operations have ended, and the wellbore is cased with a 7-in. production liner in preparation for testing. No evidence of formation water has been detected.

In the first well test at Kurdamir-3, Talisman will perforate the deepest interval between 2,776 and 2,788 m. Based on initial logging results, WesternZagros believes that the lowest known oil could extend 150 m deeper than that proven in Kurdamir-2.

The test program will then move uphole to focus on testing the potential of the porous reservoir section. WesternZagros expects to complete the Oligocene testing program in the second half of August.

Meanwhile, the 184 sq km Kurdamir block 3D seismic survey has been completed in order to define more clearly the areal extent of the Oligocene, Eocene, and Cretaceous reservoirs. Following the completion of seismic operations on Talisman’s neighboring block, the seismic crew will shoot a 3D survey on the northern part of the Garmian block in August.

The North Garmian survey will cover 258 sq km to define more clearly the areal extent of the Oligocene reservoirs. The North Garmian and Kurdamir 3D surveys will be combined to provide contiguous seismic coverage in order to determine whether the Oligocene reservoir is connected as one large structure across the two blocks. The data will be used to decide on future appraisal and development well locations and to refine resource assessments.

Elsewhere on the Garmian block, a crew is rigging up to drill the Baram-1 well with an anticipated spud date in the first half of August. Baram-1 will explore the potential extension of the oil leg discovered in the Oligocene reservoir of the Kurdamir structure onto the northern part of the Garmian block. Drilling time is 5 months to planned total depth of 3,800 m.

WesternZagros said Baram-1 “is the highest impact well of the 2013 drilling program and has the potential to add gross unrisked mean contingent resources of up to 200 million to 300 million bbl of oil equivalent in the Garmian block and, if the structure is shown to extend onto the existing Kurdamir discovery, an additional 500 to 600 MMboe in the Kurdamir block.”

Also on Garmian, the Hasira-1 appraisal and exploratory well is drilling ahead at 1,860 m after setting 20-in. casing at 1,014 m. The next casing point is at 2,050 m. Setting the third intermediate string of casing is planned for 3,900 m, just above the Jeribe reservoir, before drilling to a planned total depth of 4,100 m in the Oligocene reservoir.

WesternZagros plans to complete the well either in the Jeribe or the Oligocene reservoir depending on drilling and test results. Drilling time is estimated at 7 months.

Also on Garmian, WesternZagros drilled two of the planned three wells in the Upper Bakhtiari formation. This shallow, inexpensive well program recovered formation water and oil and gas at subcommercial rates. The wells have been suspended, the third well canceled, and the rig released.

The Upper Bakhtiari program was exploring low-cost oil production potential in the South Garmian area but was not viewed as a high-potential program to add greatly to the Company's resource estimates.

Related Articles

Petrobras confirms extent of Farfan area discovery, finds reservoir

02/02/2015 The drilling of a third extension well in the Farfan area in the ultradeepwater Sergipe basin confirmed the extent of the 2013 light oil and gas di...

Antero trimming, delaying Marcellus drilling

02/02/2015 Antero Resources Corp., Denver, has announced a $1.8 billion budget for 2015, which is down 41% from 2014. The independent said it plans to defer c...

Fluid typing extends production in Chinese gas reservoir

02/02/2015 Comprehensive evaluation and classified recognition (CECR) of fluid typing and zonation (FTZ) is a prerequisite for developing multilayer sandstone...

Santos acquires interest in block offshore Malaysia

02/02/2015 Santos Ltd. has acquired 20% interest in a deepwater permit offshore Sabah, Malaysia. The company will take 10% from each of Japan’s Inpex and oper...

Mud volcanoes show gas hydrates potential in India's Andaman Islands

02/02/2015 Minutes after the M9.0 Sumatra-Andaman earthquake in 2004, mud volcanoes erupted on Diglipur Island in North Andaman. The eruptions resulted in an ...

OGJ Newsletter

02/02/2015

International news for oil and gas professionals

The ANWR blitz

02/02/2015 Deception begins with a 58-sec video on the White House web site in which President Barack Obama says he'll ask Congress to make the whole Arctic N...

BHP to drill first deepwater well off Trinidad in 2016, energy minister says

01/30/2015 BHP Billiton and its partner BP PLC will drill their first well in Trinidad and Tobago’s deep water in 2016 according to the Caribbean twin-island ...

Pennsylvania governor reinstates state forest drilling moratorium

01/29/2015 Pennsylvania Gov. Tom Wolf (D) signed an executive order fully reinstating a 2010 moratorium on new oil and gas leases in state forests and parks. ...
White Papers

Transforming the Oil and Gas Industry with EPPM

With budgets in the billions, timelines spanning years, and life cycles extending over decades, oil an...
Sponsored by

Asset Decommissioning in Oil & Gas: Transforming Business

Asset intensive organizations like Oil and Gas have their own industry specific challenges when it com...
Sponsored by

Squeezing the Green: How to Cut Petroleum Downstream Costs and Optimize Processing Efficiencies with Enterprise Project Portfolio Management Solutions

As the downstream petroleum industry grapples with change in every sector and at every level, includin...
Sponsored by

7 Steps to Improve Oil & Gas Asset Decommissioning

Global competition and volatile markets are creating a challenging business climate for project based ...
Sponsored by

The impact of aging infrastructure in process manufacturing industries

Process manufacturing companies in the oil and gas, utilities, chemicals and natural resource industri...
Sponsored by

What is System Level Thermo-Fluid Analysis?

This paper will explain some of the fundamentals of System Level Thermo-Fluid Analysis and demonstrate...

Accurate Thermo-Fluid Simulation in Real Time Environments

The crux of any task undertaken in System Level Thermo-Fluid Analysis is striking a balance between ti...

6 ways for Energy, Chemical and Oil and Gas Companies to Avert the Impending Workforce Crisis

As many as half of the skilled workers in energy, chemical and oil & gas industries are quickly he...
Sponsored by
Available Webcasts

On Demand

Global LNG: Adjusting to New Realities

Fri, Mar 20, 2015

Oil & Gas Journal’s March 20, 2015, webcast will look at how global LNG trade will be affected over the next 12-24 months by falling crude oil prices and changing patterns and pressures of demand. Will US LNG production play a role in balancing markets? Or will it add to a growing global oversupply of LNG for markets remote from easier natural gas supply? Will new buyers with marginal credit, smaller requirements, or great need for flexibility begin to look attractive to suppliers? How will high-cost, mega-projects in Australia respond to new construction cost trends?

register:WEBCAST


US Midstream at a Crossroads

Fri, Mar 6, 2015

Oil & Gas Journal’s Mar. 6, 2015, webcast will focus on US midstream companies at an inflection point in their development in response to more than 6 years shale oil and gas production growth. Major infrastructure—gas plants, gathering systems, and takeaway pipelines—have been built. Major fractionation hubs have expanded. Given the radically changed pricing environment since mid-2014, where do processors go from here? What is the fate of large projects caught in mid-development? How to producers and processors cooperate to ensure a sustainable and profitable future? This event will serve to set the discussion table for the annual GPA Convention in San Antonio, Apr. 13-16, 2015.

This event is sponsored by Leidos Engineering.

register:WEBCAST


The Future of US Refining

Fri, Feb 6, 2015

Oil & Gas Journal’s Feb. 6, 2015, webcast will focus on the future of US refining as various forces this year conspire to pull the industry in different directions. Lower oil prices generally reduce feedstock costs, but they have also lowered refiners’ returns, as 2015 begins with refined products priced at lows not seen in years. If lower per-barrel crude prices dampen production of lighter crudes among shale plays, what will happen to refiners’ plans to export more barrels of lighter crudes? And as always, refiners will be affected by government regulations, particularly those that suppress demand, increase costs, or limit access to markets or supply.

register:WEBCAST


Oil & Gas Journal’s Forecast & Review/Worldwide Pipeline Construction 2015

Fri, Jan 30, 2015

The  Forecast & Review/Worldwide Pipeline Construction 2015 Webcast will address Oil & Gas Journal’s outlooks for the oil market and pipeline construction in a year of turbulence. Based on two annual special reports, the webcast will be presented by OGJ Editor Bob Tippee and OGJ Managing Editor-Technology Chris Smith.
The Forecast & Review portion of the webcast will identify forces underlying the collapse in crude oil prices and assess prospects for changes essential to recovery—all in the context of geopolitical pressures buffeting the market.

register:WEBCAST


Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected