Granite Wash gas plant starts up

Eagle Rock Energy Partners LP has started up its 60-MMcfd cryogenic processing plant in Wheeler County, Tex., in the Granite Wash play (OGJ Online, Mar. 7, 2013).

The plant includes the associated Mills Ranch compressor station and lies on a 50-acre site owned by Eagle Rock in the center of the company’s existing high-pressure gathering system.

Eagle Rock also built other pipeline enhancements in the immediate area for product gathering, transportation, and marketing to and from the Wheeler plant. The supporting infrastructure and plant site were designed to accommodate one or more additional expansions.

With the completion of the plant, Eagle Rock said it will have more than 500 MMcfd of high-efficiency cryogenic processing capacity in the Granite Wash play. Construction of the plant, associated gathering and pipelines cost about $65 million, said the company.

Related Articles

Rosneft advances hydrotreating complex at Syzran refinery

08/29/2014 OAO Rosneft has received a reactor and cold high-pressure separator to be used in the construction of a planned diesel hydrotreating complex at its...

Damaged unit weighs on diesel output at Porvoo refinery

08/29/2014 Repairs remain under way on a damaged hydrogen production unit at Neste Oil Corp.’s 205,000-b/d Porvoo refinery in the Kilpilahti Industrial Area, ...

PDVSA shuts refinery generator for maintenance

08/29/2014 Petroleos de Venezuela SA (PDVSA) has shut down the power generation system that supplies its 190,000-b/d Puerto La Cruz refinery in eastern Venezu...

BP confirms fire at Whiting refinery

08/28/2014 An overnight fire at BP PLC’s 413,000-b/d refinery in Whiting, Ind., has resulted in only minimal interruptions to operations at the site, the comp...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected