Namibia: HRT spuds second Walvis basin wildcat

A group led by a unit of HRT Participacoes em Petroleo SA, Rio de Janeiro, has spudded the Murombe-1 exploratory well on PEL 23 in the Walvis basin offshore Namibia.

HRT Walvis Petroleum (Pty.) Ltd. said the Murombe 2212/06-1 well will test a 1,000 sq km basin floor fan on a four-way dip closure at its highest structural elevation in a turbidite complex of Barremian age. The drill site is in 1,391 m of water 220 km northwest of Walvis Bay.

This well, second in a three-well program, is 15 km east of HRT’s Wingat-1 well on PEL 23 that penetrated two excellent oil source rocks from which liquid hydrocarbons were recovered. At Murombe, a shallower secondary objective, the Santonian-age Baobab confined channel complex with turbidite reservoirs, which is between the two source rocks, will also be evaluated.

Boabab is expected at 3,670 m below sea level and Murombe at 5,090 m. Drilling time is an estimated 72 days to 5,360 m.

Related Articles

INTERNATIONAL BRIEFS

01/01/1990 WESTCOAST ENERGY INC., Vancouver, B.C., agreed to buy the utilities and propane business of Inter-City Gas Corp. (ICG), Winnipeg, Man., for $720 mi...

OWNERSHIP QUESTIONS CAN STYMIE DEVELOPMENT OF COALBED METHANE

01/01/1990 Although the technology exists for commercial recovery of coalbed methane, production has been hindered because of the legal quandary as to ownersh...

OIL FLOW RISING IN E. CHINA REGION

01/01/1990 Production is building from an oil producing area in the lower reaches of the Yangtze River in eastern China's Jiangsu Province. The northern J...

GAS EXPLORATION FANS OUT MIN ARKOMA BASIN

01/01/1990 Gas exploration is heating up in the South Central Arkoma basin's pre-Pennsylvanian formations. Several operators are targeting Siluro-Devonian...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected