TransCanada to build Alberta crude line, terminal

TransCanada Corp. has reached binding long-term shipping agreements to build, own, and operate the proposed Alberta-based Heartland Pipeline and TC Terminals projects. The projects will include a 200-km, 900,000 b/d pipeline connecting the Edmonton region to Hardisty, Alta., and a crude terminal with 1.9 million bbl of storage in the Heartland industrial area north of Edmonton. TransCanada expects the projects to enter service in second-half 2015.

The company described the project as geared toward helping move an expected 3 million b/d increase in Alberta oil production over the next 15 years to Eastern Canada and the US.

TransCanada intends to file a regulatory application for the terminal in this spring, followed by a separate application for the pipeline in the fall. It expects the projects’ combined cost to total $900 million.

TransCanada last year announced the Grand Rapids Pipeline project, a 500-km pipeline system to transport crude oil and diluent between the producing area northwest of Fort McMurray and the Edmonton-Heartland region. The system will deliver 900,000 b/d of crude and 330,000 b/d of diluent by early 2017 (OGJ Online, Oct. 29, 2012).

Contact Christopher E. Smith at chriss@ogjonline.com.

Related Articles

China’s demand growth may make it globally dominant, speakers suggest

09/18/2014 China potentially could dictate terms as the fastest growing market in a world suddenly awash in potential oil and gas resources, speakers suggeste...

Spectra, NU announce New England gas pipeline expansion

09/17/2014 Spectra Energy Corp., Spectra Energy Partners, and Northeast Utilities (NU) plan to build the 1-bcfd Access Northeast natural gas pipeline expansio...

Senators offer bill to reform energy project cross-border permitting

09/16/2014 Four US senators—2 Democrats and 2 Republicans—introduced legislation to prevent extended delays of energy projects requiring a cross-border permit...

API official calls for end to nearly 6-year Keystone XL permit delay

09/16/2014 Three days before the sixth anniversary of TransCanada Corp.’s original filing for presidential approval of the proposed Keystone XL crude oil pipe...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected