Enquest lets contract for Thistle repair

Enquest PLC, London, has let a contract for inspection, repair, and maintenance services to Hallin Marine in its revitalization of the Thistle Alpha drilling and production platform in the North Sea 275 miles northeast of Aberdeen (OGJ Online, Feb. 5, 2013).

Hallin will use its Stril Explorer DP2 multipurpose support vessel to perform the work. The 60-slot platform, in 524 ft of water, was installed in 1976. It handles production from Thistle and Devon oil fields, now with 19 producing wells and 7 water injectors.

Enquest expects its revitalization project to recover an extra 35 million boe of oil and gas and to extend Thistle field’s life to 2025 or beyond with water injection and infill drilling.

Related Articles

Bakken field production reaches 1 billion bbl mark

04/28/2014 Citing data from IHS, Continental Resources Inc. reported that Bakken field has surpassed 1 billion bbl of cumulative light, sweet crude oil produc...

EIA: Marcellus gas production continues to outpace takeaway capacity

04/25/2014 Rising production of natural gas in the Marcellus shale play in the Appalachian basin continues to outpace the growth in the region’s pipeline take...

Baker Hughes: US drilling rig count leaps to 1,861

04/25/2014 The US drilling rig count jumped 30 units to reach a total of 1,861 rigs working during the week ended Apr. 25, Baker Hughes Inc. reported. The US ...

Gazprom loads first oil shipment from Arctic’s Prirazlomnoye field

04/21/2014 JSC Gazprom Neft has loaded its first shipment of oil produced from Prirazlomnoye field, 60 km offshore in the Russian Arctic shelf. The field was ...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected