BP starts Cherry Point diesel hydrotreater

May 10, 2013
BP PLC has commissioned a diesel hydrotreater and hydrogen plant at its 234,000-b/d Cherry Point refinery at Blaine, Washington.

BP PLC has commissioned a diesel hydrotreater and hydrogen plant at its 234,000-b/d Cherry Point refinery at Blaine, Washington.

The hydrotreater has production capacity of 25,000 b/d. The hydrogen unit’s capacity is 44 MMscfd.