Second-phase work starts on Halfaya field

A group led by PetroChina Co. Ltd. has begun work on the second phase of development of giant Halfaya oil field in Iraq, reports PetroChina parent China National Petroleum Corp.

The first phase, which started up in June 2012, is producing 100,000 b/d of crude oil and 2.6 million cu m/day of natural gas (OGJ Online, June 27, 2012).

The second phase includes the drilling of 60 wells, laying of a 272-km trunk pipeline, and construction of a 5 million tonne/year crude processing center. The project, to be operational in the second quarter of 2014, will add 200,000 b/d of production.

Total production is to reach 600,000 b/d when the third phase is complete at the end of 2016, CNPC said.

PetroChina’s partners are Total E&P Iraq, Petronas Carigali, and South Oil Co.

Related Articles

INTERNATIONAL BRIEFS

01/01/1990 WESTCOAST ENERGY INC., Vancouver, B.C., agreed to buy the utilities and propane business of Inter-City Gas Corp. (ICG), Winnipeg, Man., for $720 mi...

OWNERSHIP QUESTIONS CAN STYMIE DEVELOPMENT OF COALBED METHANE

01/01/1990 Although the technology exists for commercial recovery of coalbed methane, production has been hindered because of the legal quandary as to ownersh...

OIL FLOW RISING IN E. CHINA REGION

01/01/1990 Production is building from an oil producing area in the lower reaches of the Yangtze River in eastern China's Jiangsu Province. The northern J...

GAS EXPLORATION FANS OUT MIN ARKOMA BASIN

01/01/1990 Gas exploration is heating up in the South Central Arkoma basin's pre-Pennsylvanian formations. Several operators are targeting Siluro-Devonian...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected