Poland microseismic frac monitoring array in place

MicroSeismic Inc., Houston, said it has installed equipment to monitor, map, and analyze hydraulic fracturing of an undisclosed customer’s exploration and field development program in Poland.

Geophones are spaced across 10-12 radial arms and can number in the thousands. Stations can be deployed using standard cabling technology or wirelessly to minimize field operation time and reduce cost. This enables the monitoring of primary, secondary, and tertiary recovery activity, in a variety of reservoir conditions.

Using real-time monitoring services, customers can adjust pumping rates and the type of proppant and fluids being used during a frac job to optimize well completion.

The installed array is able to cover a 12 to 40 sq km area, said Peter Duncan, founder and chief executive officer.

Related Articles

INTERNATIONAL BRIEFS

01/01/1990 WESTCOAST ENERGY INC., Vancouver, B.C., agreed to buy the utilities and propane business of Inter-City Gas Corp. (ICG), Winnipeg, Man., for $720 mi...

OWNERSHIP QUESTIONS CAN STYMIE DEVELOPMENT OF COALBED METHANE

01/01/1990 Although the technology exists for commercial recovery of coalbed methane, production has been hindered because of the legal quandary as to ownersh...

OIL FLOW RISING IN E. CHINA REGION

01/01/1990 Production is building from an oil producing area in the lower reaches of the Yangtze River in eastern China's Jiangsu Province. The northern J...

GAS EXPLORATION FANS OUT MIN ARKOMA BASIN

01/01/1990 Gas exploration is heating up in the South Central Arkoma basin's pre-Pennsylvanian formations. Several operators are targeting Siluro-Devonian...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected