Bowleven well adds hydrocarbons offshore Cameroon

Bowleven PLC will set liner and conduct tests after its IM-5 well in Block MLHP-7 of the Etinde permit offshore Cameroon validated sufficient gas volumes to meet requirements of a planned onshore fertilizer plant.

The IM-5 well reached the Middle Isongo primary objective and encountered liquids-rich hydrocarbon-bearing pay in both Middle Isongo and the Intra Isongo reservoir objectives based on the results of drilling, core analysis, wireline logs, fluid samples, and pressure data. TD is 3,430 m measured depth in 56 m of water.

The company continues efforts to finalize the gas sales heads of terms with Ferrostaal GmbH and obtain an exploitation authorization from the government.

The well intersected a 33-m log evaluated gross hydrocarbon interval in Middle Isongo with an estimated 25 m of net pay. Logs indicate a hydrocarbon-water contact at 3,360 m MD, extending and deepening the hydrocarbon column encountered at the IM-3 well by 93 m. A further 20 m of reservoir quality sands were encountered beneath the HWC, and the well was still in sand at TD.

Core analysis and fluid samples confirm the presence of liquids-rich hydrocarbons. Initial sample analysis suggests a liquids-to-gas ratio in the region of 150 bbl/MMscf.

In the Intra Isongo the well intersected a log-evaluated gross hydrocarbon interval of 80 m in reservoir sands that correspond to the seismic event identified before drilling. Net pay is estimated to be 70 m, and no HWC was encountered.

Fluid samples acquired during logging activities confirm the presence of liquids-rich hydrocarbons. Initial sample analysis suggests a liquids-to-gas ratio in the region of 200 bbl/MMscf.

In the Upper Isongo the well intersected 32 m of high-quality reservoir sands which log evaluation indicates are water-bearing as predicted. Sand thickness and quality were consistent with pre-drill expectations.

Related Articles

INTERNATIONAL BRIEFS

01/01/1990 WESTCOAST ENERGY INC., Vancouver, B.C., agreed to buy the utilities and propane business of Inter-City Gas Corp. (ICG), Winnipeg, Man., for $720 mi...

OWNERSHIP QUESTIONS CAN STYMIE DEVELOPMENT OF COALBED METHANE

01/01/1990 Although the technology exists for commercial recovery of coalbed methane, production has been hindered because of the legal quandary as to ownersh...

OIL FLOW RISING IN E. CHINA REGION

01/01/1990 Production is building from an oil producing area in the lower reaches of the Yangtze River in eastern China's Jiangsu Province. The northern J...

GAS EXPLORATION FANS OUT MIN ARKOMA BASIN

01/01/1990 Gas exploration is heating up in the South Central Arkoma basin's pre-Pennsylvanian formations. Several operators are targeting Siluro-Devonian...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected