Suncor's fourth Firebag phase starts up

Suncor Energy’s Firebag in situ production complex in the oil sands region of Alberta was producing 130,000 b/d of bitumen at the end of November following start-up of the project’s fourth phase.

The company earlier reported production at the end of the third quarter of 120,000 b/d from the first three phases (OGJ Online, Oct. 23, 2012).

When the fourth phase reaches full production, total Firebag output will be 180,000 b/d.

Suncor owns 100% of the Firebag complex, which is east of Fort McMurray.

Related Articles

Petrobras starts production from Iracema discovery

10/15/2014

Petroleo Brasileiro SA (Petrobras) has started production from the Iracema area on Block BM-S-11 in the Santos basin offshore Brazil.

Pemex lets production systems contract for Lakach development

10/14/2014 Petroleos Mexicanos (Pemex) has let a $290-million subsea production systems contract to OneSubsea, a joint venture of Cameron International Corp. ...

Contract let for early Snorre C TLP work

10/14/2014 Statoil has let a contract to Wood Group Mustang for preliminary work on a tension-leg platform proposed for Snorre oil and gas field in the Tampen...

Daybreak advances Kentucky, California operations

10/13/2014

Daybreak Oil & Gas Inc., Spokane, Wash., has advanced its operations in Kentucky and California.

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected