ROVs find no leaking oil from Macondo

Remotely operated vehicles (ROV) investigating a recurring sheen near the deepwater Macondo wellhead and Deepwater Horizon semisubmersible wreckage identified no sources of leaking oil, officials said.

BP PLC operated the Macondo well, which was drilled by Transocean Ltd. using the Deepwater Horizon. An April 2010 blowout resulted in the deaths of 11 people aboard the Deepwater Horizon, which sank after a fire and explosion. The blowout caused a massive oil spill.

The latest ROV inspection, which concluded Dec. 16, was prompted by a report that a sheen was observed during November. An unidentified substance inconsistent with oil was seen emitting from several areas of the rig wreckage, and samples were collected for further lab analysis.

“No apparent source of the surface sheen has been discovered by this effort,” said US Coast Guard Capt. Duke Walker, federal on-scene coordinator. “Next steps are being considered as we await the lab results of the surface and subsurface samples and more detailed analysis of the video shot during the mission."

The Macondo wellhead was found to be secure. On Sept. 19, 2010, the well was closed off and cemented.

Satellite surveillance will continue to monitor the sheen while future steps are being considered.

The real time ROV operations were observed remotely by government officials. Video of the ROV inspections will be made available shortly and posted online.

In September BP reported a sheen and discovered a containment dome was leaking oil. An ROV operation was done to cap the containment dome leaks. No oil emissions from the containment dome were observed after the capping operation (OGJ Online, Nov. 30, 2012).

 

Related Articles

Petrobras starts production from Iracema discovery

10/15/2014

Petroleo Brasileiro SA (Petrobras) has started production from the Iracema area on Block BM-S-11 in the Santos basin offshore Brazil.

Pemex lets production systems contract for Lakach development

10/14/2014 Petroleos Mexicanos (Pemex) has let a $290-million subsea production systems contract to OneSubsea, a joint venture of Cameron International Corp. ...

Contract let for early Snorre C TLP work

10/14/2014 Statoil has let a contract to Wood Group Mustang for preliminary work on a tension-leg platform proposed for Snorre oil and gas field in the Tampen...

Daybreak advances Kentucky, California operations

10/13/2014

Daybreak Oil & Gas Inc., Spokane, Wash., has advanced its operations in Kentucky and California.

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected