Tunisia: Remedial work hikes Ezzaouia field oil output

A remedial campaign conducted by the Maretap joint venture has restored output in Ezzaouia field in Tunisia to 750 b/d of oil, and the Ezzaouia-1 well is expected to return to production in the second half of December 2012, said Candax Energy Inc., Toronto.

Send this story to:

Enter the email address of the recipient.
Separate multiple addresses with commas.

Add your own personal message:

Enter your email address:

Note: Your email address is used only to let the recipient know who sent the story, and in case of transmission error. Both your address and the recipient's address will not be used for any other purpose.