Syncrude lets oil sands tailings contracts

Syncrude Canada Ltd. has let two contracts to KBR for module fabrication and field construction of a full-scale plant for processing tailings from its oil sands mines northeast of Fort McMurray, Alta.

The plant will dewater fine tailings with centrifuges in a process that Syncrude says reduces overall volume by 50% or more. The process yields a soft, clay-rich material that can be used in land reclamation. Water is recycled for plant operations.

The new facility will represent the first phase of a commercial plant due in operation by 2015.

Centrifuging technology is one of Syncrude’s responses to a 2009 directive on tailings management by the Energy Resources Conservation Board of Alberta (OGJ Online, Dec. 2, 2009).

Other tailings-management methods Syncrude is developing include water-capping, in which fresh water is deposited over tailings in a settling pond to form a lake, and composite tails, in which the addition of gympsum and sand accelerates the settling of fine tails.

Tailing ponds hold the mixture of water, solids, and other fluids left over from the initial processing of mined oil sands. Because fine tailings settle out slowly, cycling of tailing ponds can require decades. In the meantime, more tailing ponds must be built, requiring more surface disturbance.

The ERCB’s tailings-management directive addressed that problem. Earlier this year a study conducted for Alberta Innovates—Energy and Environment Solutions, a government agency, by an industry consortium outlined nine “roadmaps” for tailings management (OGJ Online, Aug. 31, 2012).

Related Articles

Cenovus starts production from Phase F at Foster Creek oil sands project

09/19/2014 Cenovus Energy Inc., Calgary, started oil production earlier this month at its recently completed Phase F expansion at its Foster Creek oil sands p...

Andora Sawn Lake SAGD pilot begins bitumen production

09/18/2014 Andora Energy Corp. has recompleted its pilot steam-assisted gravity drainage (SAGD) well in Sawn Lake, Alta., and expects a stable bitumen product...

AAPG ICE: Seismic reprocessing enhances potential for Russia’s legacy basins

09/17/2014 Russia’s Precaucus and Uralian Foreland basins are the oldest and most developed oil and gas producing regions in the country. As the “birthplace” ...

API official calls for end to nearly 6-year Keystone XL permit delay

09/16/2014 Three days before the sixth anniversary of TransCanada Corp.’s original filing for presidential approval of the proposed Keystone XL crude oil pipe...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected