First phase of Sturgeon refinery approved

Partners in the North West Redwater Partnership have approved construction of the first phase of the Sturgeon bitumen refinery in the Industrial Heartland area of Alberta (OGJ Online, Jan. 28, 2010). The facility will be the world’s first refinery integrating gasification of residual oil with carbon-dioxide capture in its initial design.

Capacity of the first phase, estimated to cost $5.7 billion, will be 50,000 b/d. The facility will capture 1.2 million tonnes/year of CO2 to be sold for use in enhanced oil recovery. Construction is to start in spring of 2013 and take 3 years.

Partners are North West Upgrading Inc. and Canadian Natural Upgrading Ltd., a wholly owned subsidiary of Canadian Natural Resources Ltd.

Under 30-year processing agreements, Alberta Petroleum Marketing Commission, an agent of the province of Alberta, will supply 75% of the feedstock. CNRL will supply the rest. The suppliers will receive proportionate shares of the products.

Two further phases with capacities of 50,000 b/d each are envisioned for the refinery, near Redwater in Sturgeon County, about 45 km northeast of Edmonston.

The main product will be ultralow-sulfur diesel. CO2 capture is planned in each phase.

Related Articles

Damaged unit weighs on diesel output at Porvoo refinery

08/29/2014 Repairs remain under way on a damaged hydrogen production unit at Neste Oil Corp.’s 205,000-b/d Porvoo refinery in the Kilpilahti Industrial Area, ...

PDVSA shuts refinery generator for maintenance

08/29/2014 Petroleos de Venezuela SA (PDVSA) has shut down the power generation system that supplies its 190,000-b/d Puerto La Cruz refinery in eastern Venezu...

BP confirms fire at Whiting refinery

08/28/2014 An overnight fire at BP PLC’s 413,000-b/d refinery in Whiting, Ind., has resulted in only minimal interruptions to operations at the site, the comp...

Planned maintenance under way at ExxonMobil’s Baytown complex

08/28/2014 ExxonMobil Corp. has started scheduled maintenance on a fluid catalytic cracking (FCC) unit at its 561,000-b/d integrated refining and petrochemica...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected