Yemen: Calvalley updates Masila Block 9 oil output

Calvalley Petroleum Inc., Calgary, said its Ras Nowmah-4 appraisal well on Block 9 in Yemen’s Masila basin is on early production at a restricted 400 b/d of oil from Cretaceous Qishn with limited pressure drawdown.

The initial results indicate that the well is capable of producing at a higher rate. Ras Nowman-4, which went to 1,475 m and encountered 9 m of net Qishn oil column, is the second appraisal well that offsets the 2010 Ras Nowmah-2 discovery well.

The Phase 1 production test, which began on Oct. 7, will allow the well time to cleanup and for the company to determine the proper sized pump for long-term production operations.

Ras Nowmah-5, which was drilled before Ras Nowmah-4 and encountered 11 m of net oil column, will be completed after the contractor performs a remedial operation to ensure the integrity of the cement behind the production casing.

Gross production is averaging 5,500-5,700 b/d, including 2,300 b/d at Hiswah, 2,100 b/d at Ras Nowmah-2, and 1,200 b/d at Al Roidhat. Production averaged 4,700 b/d in the quarter ended Sept. 30 due to heavy rains that restricted trucking of oil from the plateau.

The company sold 160,056 bbl of oil in the quarter at an average expected to exceed $110/bbl and had a quarter’s end crude oil inventory estimated at 40,000-45,000 bbl.

Related Articles

Kentucky: Daybreak begins 2014 drilling campaign

03/28/2014 Daybreak Oil & Gas Inc., Spokane, Wash., has drilled the first well in its 20-well development drilling program for the 2014-15 fiscal year at ...

Egypt: IPR finds oil, gas in Southwest Gebel El-Zeit prospect

03/07/2014 Irving, Tex., independent IPR Inc. has made a discovery in its first drilled well, SWGEZ-5, in its Southwest Gebel El-Zeit concession in the Gulf o...

Guatemala: Atzam oil project advances

03/07/2014 Latin American Resources Ltd. (LAR) has drilled to 1,250 ft and successfully set and cemented the first intermediate 13.375-in. casing string in th...

Lundin completes Barents Sea exploration well

02/21/2014 Lundin Petroleum AB reported through its subsidiary, Lundin Norway AS, that it has completed drilling of its 7222/11-2 well on the Langlitinden pro...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected