Statoil sees more oil beyond Fram H North project

A group led by Statoil ASA plans to start production in the third quarter of 2014 from the Fram H North structure in the North Sea offshore Norway in a fast-track project to recover an estimated 10 million bbl of oil equivalent and which may lead to other developments.

Fram H North, discovered in 2007 and one of the smallest fast-track developments on the Norwegian Continental Shelf, involves setting a seabed template that is connected to Fram West A2 template, which ships production to the Troll C platform.

The Statoil group will install seabed equipment and lay pipelines and control cables in mid-2013. It will drill a dual lateral well in the fourth quarter of 2013 to optimally drain the reservoir.

The project has been important for Fram operations in maintaining a high temperature in the flow line to the Troll C host platform, Statoil said. This enables the group to avoid using scale wax inhibitors in the pipelines between Fram and Troll C.

Halfdan Knudsen, project manager for field development in Statoil, said Fram H North “may be a door opener for new developments in the area as the license partners have approved the installation of a 4-slot standard template to be used for additional targets or for tying back prospects in the event of discoveries.”

Fram H North straddles PL090 and PL248 north of Fram West in the Troll area. Statoil has a 45% stake in PL090 and 60% in PL248. ExxonMobil has 25%, GDF Suez 15%, and Idemitsu 15% in PL090, and Petoro has 40% in PL248.

Fram H North is the tenth fast-track project in Statoil's portfolio.

Related Articles

Baker Hughes: US drilling rig count jumps to 1,831

04/11/2014

The US drilling rig count jumped 13 units to reach 1,831 rigs working during the week ended Apr. 11, Baker Hughes Inc. reported.

ConocoPhillips raises estimates on Eagle Ford recoverable resources, production

04/11/2014 ConocoPhillips has increased its estimated resource base in the Eagle Ford play to 2.5 billion bbl of oil in place from 1.8 billion bbl, as well as...

Chevron, YPF to continue Vaca Muerta development

04/10/2014 Chevron Corp. and YPF SA, Buenos Aires, will continue development of Argentina’s Vaca Muerta shale formation. Chevron says it will build off the pr...

MARKET WATCH: NYMEX oil price jumps on EIA’s reduced oil production forecast

04/09/2014 The benchmark US crude oil futures price jumped more than $2/bbl on Apr. 8 after the US Energy Information Administration released a report saying ...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected