BP group starts gas flow from UK Devenick field

A group led by BP Exploration Operating Co. Ltd. has started gas production from Devenick field in the UK Central North Sea.

Initial rate is 100 MMscfd of gas. The field is estimated to hold 430 bscf of recoverable gas and to remain on production until 2025. The UK sanctioned the project in late 2010.

Devenick gas flows through a subsea manifold through highly-insulated flowlines and high-pressure control and safety systems to Marathon’s East Brae platform 34 km to the south. From East Brae the gas continues to the UK grid via the SAGE pipeline system and the St. Fergus terminal.

Licensees in Devenick are BP 50%, Britoil PLC 38.7%, and RWE Dea UK SNS Ltd. 11.3%.

Related Articles

Santos brings Peluang gas development on stream

03/24/2014

Santos Ltd., Adelaide, has started natural gas production from its Peluang development offshore the Indonesian island of Java.

Baker Hughes: US drilling rig count drops to 1,803

03/21/2014 After consecutive weeks of significant gains, the US drilling rig count lost 6 units to 1,803 rigs working during the week ended Mar. 21, Baker Hug...

Cenovus gets AER approval for Grand Rapids oil sands project

03/21/2014 Cenovus Energy Inc. reported that it has received approval from the Alberta Energy Regulator (AER) for its wholly owned Grand Rapids thermal oil sa...

Shell lets contracts for Majnoon development

03/18/2014 Shell Iraq Petroleum Development BV has let engineering and procurement services contracts to Foster Wheeler Kentz Energy Services DMCC, Dubai, for...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected