Argentina: Vaca Muerta test starts after five-stage frac

Americas Petrogas Inc., Calgary, has begun to production test the operated LTE.x-1 well on the Los Toldos II block in Argentina’s Neuquen basin after performing a five-stage hydraulic frac of the Vaca Muerta shale.

The well was drilled and cased to 10,695 ft total depth and intersected a continuous 1,125 ft of shale. Americas Petrogas and ExxonMobil each have 45% interest in the block, and Gas y Petroleo del Neuquen has 10%.

Related Articles

Trinidad and Tobago’s deepwater bid round draws lackluster response

04/04/2014 Trinidad and Tobago’s latest deepwater bid round failed to attract significant interest with four of the six blocks on offer not receiving any bids...

OMV, Murphy acquire blocks offshore Namibia

04/03/2014

OMV AG and Murphy Luderitz Oil Co. Ltd. have acquired 65% interest in Blocks 2613A and 2613B offshore Namibia from Brazil’s Cowan Petroleum.

Scott links South Atlantic OCS access bill to jobs growth plan

04/03/2014 US Sen. Tim Scott (R-SC) introduced a bill that would reverse the Obama administration’s exclusion of four South Atlantic coastal states from activ...

Lukoil completes exploration well offshore Ivory Coast

04/02/2014

Lukoil Overseas has completed drilling an exploration well on Block CI-101 offshore Ivory Coast.

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected