Statoil temporarily halts production from Hammerfest LNG

By OGJ editors

Production was halted temporarily by Statoil at Hammerfest LNG on July 10 “as a result of water ingression in the natural gas dryers,” the Norwegian state-owned company reported.

Water ingression causes ice formation in the cooling circuit, Statoil said, adding, “Big efforts are being made to get the gas liquefaction plant back on line quickly.” Closer inspection will make it possible to say how long the production halt will last, the company said.

Statoil’s share of production from Snohvit—the first petroleum development in the Barents Sea—is about 50,000 boe/d.

Hammerfest has no installations above the sea’s surface, therefore large amounts of natural gas are sent ashore and cooled down at Hammerfest LNG on Melkoya.

Hammerfest is the world’s northern-most and Europe’s first LNG export facility.

Related Articles

WINTER HITS U.S. INDUSTRY, STRAINS GAS SUPPLY

01/01/1990 A record breaking cold front before and during the weekend of Dec. 23 shut down several major refineries and petrochemical plants in the U.S. Gulf ...

TEX/CON, SPUN OFF FROM BP, UP AND RUNNING

01/01/1990 BP Exploration Western Hemisphere has spun off its U.S. Lower 48 onshore exploration/development and gas gathering, transportation, and marketing a...

SAMEDAN BUYS GULF OF MEXICO PRODUCTION

01/01/1990 Samedan Oil Corp. has expanded its inventory of producing leases in the Gulf of Mexico. The wholly owned subsidiary of Noble Affiliates Inc., Ardmo...

OIL FLOW RISING IN E. CHINA REGION

01/01/1990 Production is building from an oil producing area in the lower reaches of the Yangtze River in eastern China's Jiangsu Province. The northern J...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected