Statoil temporarily halts production from Hammerfest LNG

By OGJ editors

Production was halted temporarily by Statoil at Hammerfest LNG on July 10 “as a result of water ingression in the natural gas dryers,” the Norwegian state-owned company reported.

Water ingression causes ice formation in the cooling circuit, Statoil said, adding, “Big efforts are being made to get the gas liquefaction plant back on line quickly.” Closer inspection will make it possible to say how long the production halt will last, the company said.

Statoil’s share of production from Snohvit—the first petroleum development in the Barents Sea—is about 50,000 boe/d.

Hammerfest has no installations above the sea’s surface, therefore large amounts of natural gas are sent ashore and cooled down at Hammerfest LNG on Melkoya.

Hammerfest is the world’s northern-most and Europe’s first LNG export facility.

Related Articles

China’s demand growth may make it globally dominant, speakers suggest

09/18/2014 China potentially could dictate terms as the fastest growing market in a world suddenly awash in potential oil and gas resources, speakers suggeste...

Spectra, NU announce New England gas pipeline expansion

09/17/2014 Spectra Energy Corp., Spectra Energy Partners, and Northeast Utilities (NU) plan to build the 1-bcfd Access Northeast natural gas pipeline expansio...

Senators offer bill to reform energy project cross-border permitting

09/16/2014 Four US senators—2 Democrats and 2 Republicans—introduced legislation to prevent extended delays of energy projects requiring a cross-border permit...

API official calls for end to nearly 6-year Keystone XL permit delay

09/16/2014 Three days before the sixth anniversary of TransCanada Corp.’s original filing for presidential approval of the proposed Keystone XL crude oil pipe...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected