Aromatics plant due at Abu Dhabi site

By OGJ editors

Abu Dhabi National Chemicals Co. has let a contract to Foster Wheeler’s Global Engineering & Construction Group covering production management consultancy services for an aromatics complex at Ruwais, Abu Dhabi.

The complex will convert almost 3 million tonnes/year of heavy and medium naphtha from the 350,000-b/d Takreer Ruwais refinery into paraxylene, mixed xylenes, and benzene.

It will be built in the chemical company’s Madeenat Al Gharbia site.

Related Articles

BASF-Total venture starts up 10th furnace at Port Arthur steam cracker

03/24/2014

BASF Total Petrochemicals LCC (BTP) reported the startup of a 10th furnace at its steam cracker facility in Port Arthur, Tex.

Phillips 66 considers splitter at Sweeny refinery

03/21/2014 Phillips 66 is evaluating the potential for the addition of a condensate splitter near its 247,000-b/d Sweeny refinery in Old Ocean, Tex., just sou...

Second small diesel refinery planned for North Dakota

03/21/2014 Quantum Energy Inc. (QEI), Tempe, Ariz., said it has secured land for the construction of a 20,000-b/d grassroots hydroskimming refinery in North D...

Flint Hills settles Port Arthur pollution case

03/20/2014 Flint Hills Resources (FHR) has reached a settlement with the US federal government to implement innovative technologies to control harmful air pol...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected