1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014

Drilling Production 2012 P9

  • 03/13/2012 -- Egypt: North Shadwan concession oil output starts
    BP Exploration (Delta) Ltd. has started oil production from NS377 field on the North Shadwan concession in Egypt’s southern Gulf of Suez.
  • 03/14/2012 -- ERCB approves Gemini oil sands project
    Koch Oil Sands Operating ULC has received conditional approval to build and operate the Gemini thermal oil sands project near Beaverdam in the Cold Lake area of Alberta.
  • 03/14/2012 -- Aker Solutions to design Norwegian Sea spar
    Statoil SA has let contract to Aker Solutions for front-end engineering and design of a novel spar platform for Luva gas and condensate field in the Norwegian Sea, which has been renamed Aasta Hansteen.
  • 03/14/2012 -- CNRL restarting Horizon bitumen upgrader
    Canadian Natural Resources Ltd. has begun to restart the Horizon bitumen upgrader, which it shut down Feb. 5 for unplanned maintenance on the fractionating unit (OGJ Online, Feb. 15, 2012).
  • 03/14/2012 -- Suncor upgrader gets unplanned maintenance
    Suncor Energy expects one of its two bitumen upgraders in Fort McMurray, Alta., to be offline for 3-5 weeks while it conducts unplanned maintenance related to fractionator performance.
  • 03/15/2012 -- API: EPA's proposed emission rules would slow unconventional drilling
    New Source Performance Standards proposed by the US Environmental Protection Agency would slow drilling, resulting in less oil and natural gas production, lower royalties to the federal government, and lower tax payments to state governments, according to an American Petroleum Institute study.
  • 03/16/2012 -- Sprawling Enyenra oil field appraised offshore Ghana
    Tullow Oil PLC said its Enyenra-4A appraisal well confirmed the existence of oil in good quality sandstone reservoirs in the southern part of Enyenra field offshore Ghana and the company is running injectivity tests to support waterflood design.
  • 03/16/2012 -- US drilling rig count climbs 11 units to 1,984
    US oil and gas drilling activity this week increased by 11 units to 1,984 total rigs working. The rig count for the week ended Mar. 16 was up by 264 rigs from the comparable period a year ago, Baker Hughes Inc. reported.
  • 03/19/2012 -- MEG Energy starts Surmont consultation
    MEG Energy Corp. will begin formal stakeholder consultation leading to regulatory applications to develop oil sands leases in the Surmont area of Alberta.
  • 03/20/2012 -- Contract let for Hout tripod platform
    Al-Khafji Joint Operations (KFJO), which manages offshore fields in the Partitioned Neutral Zone of Saudi Arabia and Kuwait, has let a contract to McDermott International Inc. for engineering, procurement, construction, and installation of a platform in Hout oil field.

Related Articles

EPA will set RFS requirements for this year next year

11/21/2014

How bad does regulation of the Renewable Fuel Standard have to become before the US Congress ends a program broken beyond repair?

BHI: Oklahoma, Cana Woodford lead gains in this week’s rig count

11/21/2014 A week of mostly offsetting activity saw the US drilling rig count edged up a single unit to 1,929 rigs working during the week ended Nov. 21, Bake...

EPA won’t finalize RFS’s 2014 biofuel quotas before yearend

11/21/2014 The US Environmental Protection Agency announced it will not finalize 2014 biofuel quotas under the federal Renewable Fuel Standard (RFS) before ye...

MARKET WATCH: NYMEX crude up on recovering Chinese oil demand

11/21/2014

Oil prices bounced back up $1/bbl on the New York market Nov. 20 on indications that Chinese oil demand might be recovering.

Worker killed in platform explosion offshore Louisiana

11/21/2014 An explosion that occurred on Nov. 20 at the Fieldwood Energy LLC-operated West Delta 105 E offshore platform, also known as Echo, in the Gulf of M...

Statoil halts Kwanza exploration program offshore Angola

11/21/2014 Statoil ASA has canceled the Stena Carron rig contract, effective Nov. 21, after fulfilling work commitments in company-operated Blocks 38 and 39 o...

Petrobras starts production from another Santos basin FPSO

11/21/2014 Petroleo Brasileiro SA (Petrobras) has launched production from the Cidade de Ilhabelha floating production, storage, and offloading vessel in Sapi...

Navitas to build Eaglebine natural gas gathering pipeline

11/20/2014 Navitas Midstream Partners LLC, The Woodlands, Tex., will build the La Bahia natural gas gathering system, including a 20-in. OD pipeline extending...

Total joins global climate initiatives

11/20/2014 Total SA, in what it describes as a consolidation of its efforts to address climate change, will support initiatives of the United Nations Global C...

White Papers

How to Keep Your Mud System Vibrator Hose from Getting Hammered to Death

To prevent the vibrating hoses on your oilfield mud circulation systems from failing, you must examine...
Sponsored by

Duty of Care

Good corporate social responsibility means implementing effective workplace health and safety measures...
Sponsored by

Increase Equipment Uptime Through Robust Enterprise Asset Management

Whether you operate in the Upstream Drilling and Exploration sector, the Midstream distribution sector...
Sponsored by

Continuous Improvement for Maintenance with Robust Reporting and Analytics

You should have real-time, anywhere access to more relevant and comprehensive data to help manage and ...
Sponsored by

Enterprise Asset Management Solution for Movable Assets in the Oil & Gas Industry

Drilling and exploration companies face several challenges in effectively managing assets both offshor...
Sponsored by

Supporting HSE Needs for Oil & Gas Through Effective Asset Management Practices

The Oil & Gas industry is constantly being challenged to find, extract and deliver cheaper an...
Sponsored by

Sesam for subsea design analysis

With the exponential growth in the subsea sector, a new set of challenges now face the industry. Mostl...
Sponsored by

Is the gas delivery system you’re looking at able to meet your power generation needs: a hydraulic engineer’s perspective

The hydraulic characteristics, and system response to demands and supplies, of natural gas pipelines a...
Sponsored by
[an error occurred while processing this directive]

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected