Tajikistan: Field well workover exceeds 500 b/d of oil

Tethys Petroleum Ltd. reperforated and acidized the BST20 well in Beshtentak field in Tajikistan and after applying natural gas lift obtained a flow of 533 b/d of 38° gravity oil and 441 Mcfd of gas on a 25/64-in. choke with 377 psi flowing tubinghead pressure.

Send this story to:

Enter the email address of the recipient.
Separate multiple addresses with commas.

Add your own personal message:

Enter your email address:

Note: Your email address is used only to let the recipient know who sent the story, and in case of transmission error. Both your address and the recipient's address will not be used for any other purpose.