Colombia: Putumayo rework lifts Villeta oil output

By OGJ editors

Emerald Energy PLC improved oil production by reworking the Mirto-1 well on the Maranta block in Mirto field in the Putumayo basin in Colombia, said La Cortez Energy Inc., Bogota.

The workover had the objective of initiating a long-term production test on the Villeta N sand, the same zone that is producing in the Mirto-2 well.

The rework boosted output to 334 b/d of 15° gravity oil with 1.5% BS&W on an electric submersible pump with 820 psi flowing pressure at the ESP inlet, the expected pressure needed to maintain current production levels, La Cortez Energy said. On Sept. 10 production rose to 343 b/d with 0.5% BS&W.

Mirto-2 has averaged 484 b/d of oil with 0.7% BS&W for the year with flow pressure stable at 1,065 psi, indicating the potential to increase the ESP frequency in order to maintain production levels closer to 500 b/d.

Related Articles

Cenovus gets AER approval for Grand Rapids oil sands project

03/21/2014 Cenovus Energy Inc. reported that it has received approval from the Alberta Energy Regulator (AER) for its wholly owned Grand Rapids thermal oil sa...

Shell lets contracts for Majnoon development

03/18/2014 Shell Iraq Petroleum Development BV has let engineering and procurement services contracts to Foster Wheeler Kentz Energy Services DMCC, Dubai, for...

Ivanhoe halts Tamarack oil sands project citing lack of regulatory ‘clarity’

03/18/2014 Ivanhoe Energy Inc. has suspended activity on its Tamarack oil sands project pending approval for its thermal oil sands application from the govern...

Madagascar Oil provides Tsimiroro field activity update

03/18/2014 Madagascar Oil Ltd. reported that its steam-flood pilot (SFP) in Tsimiroro heavy oil field has increased oil production from 222 b/d in December 20...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected