Ecopetrol advances Barrancabermeja upgrade

By OGJ editors

Ecopetrol SA has moved into the second phase of a major upgrade and expansion of its 250,000-b/sd Barrancabermeja refinery in Colombia.

The state-owned oil company has released Foster Wheeler’s Global Engineering and Construction Group to perform work under the new phase. The release includes additional project management consultancy and front-end engineering design; detailed engineering for crude-unit revamps; assistance with selection for engineering, procurement, and construction contracts; and control and supervision of EPC and construction contractors.

The project will raise refining capacity to 300,000 b/sd. It includes a new crude unit, delayed coker, hydrocracker, coker naphtha hydrotreater, and hydrogen and other units (OGJ, Nov. 28, 2008, Newsletter).

Ecopetrol started up a hydrotreament complex at the refinery last year (OGJ, Oct. 25, 2010, Newsletter).

Related Articles

Byco commissions Pakistan’s largest refinery

03/05/2014 Byco Oil Petroleum Ltd. (BOPL), a subsidiary of Byco Petroleum Pakistan Ltd., has commissioned its long-awaited 120,000-b/d refinery in Baluchistan...

Calumet completes Texas refinery expansion

02/21/2014

Calumet Specialty Products Partners LP has completed a 3,000-b/d expansion of the crude unit at its San Antonio, Tex., refinery.

Eni plans refining capacity cuts

02/18/2014 Italy’s Eni SPA is planning additional reductions to its Italian refining capacity by 2017 to tackle the growing refining overcapacity in the Medit...

Essar plans capacity cut at Stanlow refinery

02/18/2014 India’s Essar Energy PLC is planning to shut down a crude distillation unit at its Stanlow refinery in the UK near Ellesmere Port, Cheshire, in an ...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected