Alyeska releases TAPS low-flow impact study

Christopher E. Smith
OGJ Pipeline Editor

HOUSTON, July 1 -- Alyeska Pipeline Service Co.’s ‘Low Flow Impact Study’ of the Trans-Alaska Pipeline System warns of potential operations and safety issues if flow rate on the line drops below 350,000 b/d. TAPS, completed in 1977, transported 2 million b/d at its peak. It currently carries 650,000 b/d of oil from Alaska’s North Slope to Valdez, from where it is shipped to US West coast refineries.

The study identified water dropout and corrosion, ice formation, wax deposition, geotechnical, and other concerns posing operational risks to TAPS at throughput between 600,000 b/d and 300,000 b/d, but concluded the line could be operated safely down to 350,000 b/d if a number of issues are addressed.

These included:

Water dropout and corrosion. Water is typically entrained at current throughputs, but will start separating out at flows below roughly 500,000 b/d, according to the study, increasing the potential for internal corrosion at the bottom of the pipe.

Ice formation. Unless the crude is heated, as flow rates drop below 550,000 b/d freezing of the water in the oil is very likely during winter months, potentially icing and disabling check valves and other pipe features and instruments and creating ice slugs during pig passage. Icing could manifest itself at rates of 780,000 b/d if the hot residuum currently returned to the pipeline by refineries at North Pole, Alas., were to become unavailable, according to the study.

Wax deposition. Wax deposition increased in the mid-1990s as the crude shipped dropped below its wax-appearance temperature of roughly 75° F. The study says deposition will continue at current levels as throughput declines, even if the oil is heated in the future. Wax will then be collected and hardened by scraper pigs.

Geotechnical concerns. Assuming no heating of the oil, the study expects ice lens formation in certain soil conditions at a throughput of 350,000 b/d, causing differential movement of the pipe via frost heave, and warns that unacceptable pipe displacement limits and possible overstress conditions would be reached at 300,000 b/d.

Other operational issues include increased difficulty of pigs to remove wax, reduction in pipeline leak detection efficiency, and shutdown and restart issues related to potential ice blockages.

The study places TAPS’s reliable operating throughput at 550,000 b/d absent mitigation of these issues and 350,000 b/d with mitigations in place. The study also listed a number of issues likely to be experienced at rates below 350,000 b/d and said additional work would be required to determine potential mitigation of these issues.

Safest operations
For safe operations at 350,000 b/d, however, the study made a number of recommendations, including:

• Minimize the risk of ice formation by adding heat sources if necessary, enhancing insulation, and establishing a minimum temperature of 105° F. for crude entering TAPS from North Slope fields.

• Mitigate freezing of water in the pipeline during extended winter shutdowns, including bypass of back pressure control at the Valdez Marine Terminal.

• Develop procedures to reduce risk of throughput interruption leading to crude temperature falling below the freezing point.

• Modify current water specification to prohibit slugs above 0.35%. At throughput below 400,000 b/d reduce the water specification to 0.2% to reduce accumulation of water even in flowing conditions.

• Implement contingency procedures, practices, and facilities to reduce potential formation of ice stemming from extended pipeline shutdowns and reduced throughputs in winter.

• Reduce the risk of internal corrosion by regularly injecting corrosion inhibitor and biocides.

• Implement practices and facilities to manage continued or increased wax deposition via pigging.

• Revisit the pipeline’s cold restart analysis and implement a continuing cold-restart evaluation program, with the analysis revisited every 5 years.

• Use current curvature pig-monitoring program to monitor pipeline frost heave.

• Perform a detailed analysis of field instrument and leak detection capabilities at low flows.

• Conduct a probability analysis to determine winter design shutdown duration and associated credible minimum ambient temperatures.

• Supplement the Department of Revenue forecast for timing of low-flow related mitigation projects with the forecasting algorithm developed by the study team based on past throughput decline rates. Update the algorithm yearly.

Contact Christopher E. Smith at chriss@ogjonline.com.

Related Articles

Kinder Morgan to deliver natural gas to Corpus Christi Liquefaction

12/11/2014 Kinder Morgan Inc. (KMI) companies Kinder Morgan Texas Pipeline, Kinder Morgan Tejas Pipeline, and Tennessee Gas Pipeline Co. (TGP) have entered in...

BG agrees to sale of Australian gas pipeline to APA Group

12/10/2014

BG Group PLC agreed to sell its wholly owned subsidiary Queensland Curtis LNG Pipeline Pty. Ltd. (QCLNG) to APA Group for about $5 billion.

More West Texas gathering, processing to come onstream

12/09/2014 EagleClaw Midstream Services LLC, Midland, Tex., has bought natural gas gathering and processing in Reeves County, Tex. The company declined to ide...

Methane controls just part of complete climate strategy, speakers say

12/08/2014 Reducing oil and gas operations’ methane emissions is an essential, but far from the only, part of a comprehensive climate strategy, speakers at a ...

Rail tank car rule could cost economy billions, report says

12/08/2014 The US Pipeline and Hazardous Materials Safety Administration's (PHMSA) proposed rail tank car rule could cost the US economy as much as $60 billio...

Renewed dilbit investigation faces similar hurdles of past debate

12/05/2014 A National Research Council committee opened a second investigation of potential environmental consequences from diluted bitumen (dilbit) spills fr...

Southwestern continues Marcellus expansion

12/03/2014 Southwestern Energy Co., Houston, has signed an agreement to purchase oil and gas assets, including 46,700 net acres, in northeast Pennsylvania fro...

Keyera to own interest in new deep-cut gas plant

12/02/2014 Keyera Corp., Calgary, will take a 35% stake with Bellatrix Exploration Ltd., Calgary, in a deep-cut natural gas processing plant and related pipel...

After scuttling South Stream, Russia plans line to Turkey instead

12/02/2014 Russia has decided against the construction of the 930-km South Stream natural gas pipeline across the Black Sea from Russia to Bulgaria, citing de...

White Papers

AVEVA NET Accesses and Manages the Digital Asset

Global demand for new process plants, power plants and infrastructure is increasing steadily with the ...
Sponsored by

AVEVA’s Approach for the Digital Asset

To meet the requirements for leaner project execution and more efficient operations while transferring...
Sponsored by

Diversification - the technology aspects

In tough times, businesses seek to diversify into adjacent markets or to apply their skills and resour...
Sponsored by

Engineering & Design for Lean Construction

Modern marketing rhetoric claims that, in order to cut out expensive costs and reduce risks during the...
Sponsored by

Object Lessons - Why control of engineering design at the object level is essential for efficient project execution

Whatever the task, there is usually only one way to do it right and many more to do it wrong. In the c...
Sponsored by

Plant Design for Lean Construction - at your fingertips

One area which can provide improvements to the adoption of Lean principles is the application of mobil...
Sponsored by

How to Keep Your Mud System Vibrator Hose from Getting Hammered to Death

To prevent the vibrating hoses on your oilfield mud circulation systems from failing, you must examine...
Sponsored by

Duty of Care

Good corporate social responsibility means implementing effective workplace health and safety measures...
Sponsored by

Available Webcasts


On Demand

Optimizing your asset management practices to mitigate the effects of a down market

Thu, Dec 11, 2014

The oil and gas market is in constant flux, and as the price of BOE (Barrel of Oil Equivalent) goes down it is increasingly important to optimize your asset management strategy to stay afloat.  Attend this webinar to learn how developing a solid asset management plan can help your company mitigate costs in any market.

register:WEBCAST


Parylene Conformal Coatings for the Oil & Gas Industry

Thu, Nov 20, 2014

In this concise 30-minute webinar, participants have an opportunity to learn more about how Parylene coatings are applied, their features, and the value they add to devices and components.

register:WEBCAST


Utilizing Predictive Analytics to Optimize Productivity in Oil & Gas Operations

Tue, Nov 18, 2014

Join IBM on Tuesday, November 18 @ 1pm CST to explore how Predictive Analytics can help your organization maximize productivity, operational performance & associated processes to drive enterprise wide productivity and profitability.

register:WEBCAST


US HYDROCARBON EXPORTS Part 3 — LNG

Fri, Nov 14, 2014

US LNG Exports, the third in a trilogy of webcasts focusing on the broad topic of US Hydrocarbon Exports.

A discussion of the problems and potential for the export of US-produced liquefied natural gas.

These and other topics will be discussed, with the latest thoughts on U.S. LNG export policy.

register:WEBCAST


Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected