Namibia: 3D surveys due east of Kudu gas field

By OGJ editors
HOUSTON, Jan. 14
– UNX Energy Corp., Calgary, let a contract to Petroleum Geo-Services to shoot 1,125 sq km of 3D seismic in the Orange basin east of Kudu gas field off southern Namibia.

Shooting is to start in mid-February 2011 on blocks 2815, 2816, and 2915. Survey size is roughly twice the minimum required work commitment.

The three blocks collectively cover 16,026 sq km along the marine boundary with South Africa. UNX operates the blocks with 90% working interest.

Related Articles

INTERNATIONAL BRIEFS

01/01/1990 WESTCOAST ENERGY INC., Vancouver, B.C., agreed to buy the utilities and propane business of Inter-City Gas Corp. (ICG), Winnipeg, Man., for $720 mi...

OWNERSHIP QUESTIONS CAN STYMIE DEVELOPMENT OF COALBED METHANE

01/01/1990 Although the technology exists for commercial recovery of coalbed methane, production has been hindered because of the legal quandary as to ownersh...

OIL FLOW RISING IN E. CHINA REGION

01/01/1990 Production is building from an oil producing area in the lower reaches of the Yangtze River in eastern China's Jiangsu Province. The northern J...

GAS EXPLORATION FANS OUT MIN ARKOMA BASIN

01/01/1990 Gas exploration is heating up in the South Central Arkoma basin's pre-Pennsylvanian formations. Several operators are targeting Siluro-Devonian...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected