Alyeska plans bypass installation

Christopher E. Smith
OGJ Pipeline Editor

HOUSTON, Jan. 14 -- Alyeska Pipeline Service Co. is targeting an early evening Jan. 14 shutdown of the Trans-Alaska Pipeline System to install a 157-ft bypass pipe that would allow the pipeline to resume normal operations. The bypass line will route oil around the section of pipe where the leak occurred.

TAPS has been running at limited capacity since an 84-hr shutdown ended Jan. 11. The pipeline was stopped the morning of Jan. 8 due to a leaking pipe at Pump Station 1 on Alaska’s North Slope, 500 miles north of Fairbanks.

Crews have recovered an estimated 187 bbl of oil from the pump station since the beginning of the incident. As of midday Jan. 13, the pipeline was transporting 320,000 b/d.

Crews have also been monitoring two cleaning pigs making their way down the 800-mile pipeline. The northernmost pig was scheduled to arrive at Pump Station 8, near milepost 489, overnight Jan. 13. Crews planned to hold that pig between two valves in the mainline while routing crude oil through bypass piping, ensuring it doesn’t push any ice or wax that may have accumulated through pump station equipment.

Alyeska says no oil has been discovered outside the building.

Contact Christopher E. Smith at chriss@ogjonline.com.

Related Articles

WINTER HITS U.S. INDUSTRY, STRAINS GAS SUPPLY

01/01/1990 A record breaking cold front before and during the weekend of Dec. 23 shut down several major refineries and petrochemical plants in the U.S. Gulf ...

TEX/CON, SPUN OFF FROM BP, UP AND RUNNING

01/01/1990 BP Exploration Western Hemisphere has spun off its U.S. Lower 48 onshore exploration/development and gas gathering, transportation, and marketing a...

SAMEDAN BUYS GULF OF MEXICO PRODUCTION

01/01/1990 Samedan Oil Corp. has expanded its inventory of producing leases in the Gulf of Mexico. The wholly owned subsidiary of Noble Affiliates Inc., Ardmo...

NEW IDEAS NEEDED IN BOWEN-SURAT BASINS

01/01/1990 Exploration for petroleum in Queensland began in the Bowen and overlying Surat basins in 1908, according to Lindsay Elliott of CSR Petroleum Ltd. i...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected