PHMSA proposes possible onshore pipeline regulation changes

Nick Snow
OGJ Washington Editor

WASHINGTON, DC, Oct. 19 -- The US Pipeline and Hazardous Materials Safety Administration is considering possible changes in its regulations covering onshore liquid pipelines, the US Department of Transportation agency said on Oct. 18. It will accept comments through Jan. 18, it said in a Federal Register advance notice of probable rulemaking.

Possible changes include extending regulations to currently exempt pipelines, identifying other areas along a pipeline for extra protection or including them as additional high-consequence areas (HCAs) for integrity management protection, and establishing standards for minimum leak detection requirements for all pipelines, according to the notice.

PHMSA also is considering whether to require installation of emergency flow-restricting devices in certain areas, whether revised valve spacing requirements are needed on new construction or existing pipelines, and whether repair timeframes should be specified for pipeline segments outside HCAs that are assessed as part of integrity management programs, it said.

The agency also is looking at possibly establishing standards and procedures to improve methods for preventing, detecting, assessing, and remediating stress corrosion cracking in hazardous liquids pipelines, PHMSA said. “Comments should address the public safety and the environmental aspects of new requirements, as well as the cost implications and regulatory burden,” it indicated.

Contact Nick Snow at nicks@pennwell.com.

Related Articles

Crude oil pipeline growth, revenues surge; construction costs mount

09/01/2014 US pipeline operators continued to expand their systems rapidly in 2013. Investment in oil pipeline carrier property surged last year, rising rough...

Industry, regulators work to build US crude pipelines right

09/01/2014 Surging US production has led to strong demand for the construction of crude oil pipelines. The industry and its government regulators are working ...

CERI: Market access key to Canadian bitumen output

09/01/2014 Outcomes in two areas of critical uncertainty can mean a difference in Canadian bitumen production in 2030 of 1.7-1.8 million b/d, according to a s...

Virtual flow metering improves Chinese offshore production

09/01/2014 A common problem for inflow-rate metering in subsea wells is the lack of real-time, three-phase flow rates, which are critical for reservoir charac...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected