China

By OGJ editors
HOUSTON, June 15
– The Sunwing Energy Ltd. unit of Ivanhoe Energy Inc., Calgary, spudded the Zitong-1 horizontal exploratory well on the 1,031-sq mile Zitong block in China’s Sichuan Province.

The well is projected to fractured tight gas sands at 4,500 m at a cost of $14.5-17.5 million to drill, case, and test. Multistage fracs are planned. The well is on the 70-sq km Guan structure in the center of the block.

Ivanhoe holds 90% contractor interest in the block, and Mitsubishi Gas Chemical Co. of Japan holds the other 10%.

The second well on the block, Yixin-2, is to spud in July. It twins Sunwing’s 2007 Yixin-1, which flowed as much as 4 MMcfd of gas prior to test equipment failure. Yixin-2 will be directionally drilled to within 67 m of Yixin-1 at TD.

Related Articles

Financial questions seen for US shale gas, tight-oil plays

03/25/2014 Financial problems of operators in US shale gas and tight oil plays might hold production growth below current expectations, according to the autho...

API notes 23.1% rise in US drilling outlays in 2012

12/27/2013 Oil and gas producers spent an estimated $153.7 billion to drill US wells in 2012, 23.1% more than in 2011, the American Petroleum Institute said i...

Contact hails Kakwa Montney tight gas-liquids well results

10/16/2013 Contact Exploration Inc., Calgary, said completion of its fourth operated horizontal Middle Montney formation tight gas-liquids well extends the sc...

PIRA: Shale production growth makes US largest liquids producer

10/16/2013 US total oil supply is expected to average 12.1 million b/d this year, making it the world’s largest oil producer, PIRA Energy Group, an energy mar...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected