China

By OGJ editors
HOUSTON, May 7
– Primeline Energy Holdings Inc. plans to drillstem test potential reservoir zones at the Lishui 35-3-1 exploration well on Block 25/34 in the East China Sea off China.

Prompting the DSTs are results from two log runs over the interval from 1,383 m to total depth at 2,886 m. Logs indicated one gross 60 m section of interbedded sandstone and mudstone with more than 20 m of combined potential hydrocarbon pay in two zones. The initial interpretation indicated the presence of gas in these zones, but a gas-water contact was not detected.

Primeline is conducting a formation evaluation logging program including vertical seismic profiling, reservoir characterization instrument-repeat formation tester, and sidewall coring before setting the 9-5/8-in. casing. Drillstem testing will begin 7-8 days after casing is set.

Lishui 35-3-1 is 15 km south of the Lishui 36-1 gas discovery.

Related Articles

White House eyes steps to curb oil, gas methane emissions

03/29/2014 The White House announced additional steps to reduce methane emissions from oil and gas operations as part of a broader strategy. They included reg...

Tullow advances Kenya exploration program

03/28/2014 Tullow Oil PLC has moved forward with exploration and appraisal activities conducted by four rigs operating on Blocks 10BB and 13T onshore Kenya.

Lundin completes appraisal wells for Johan Sverdrup

03/28/2014 Lundin Norway AS, a wholly owned subsidiary of Lundin Petroleum AB, has completed Johan Sverdrup appraisal wells 16/3-8 S and 16/3-8 S T2 in the ea...

Kentucky: Daybreak begins 2014 drilling campaign

03/28/2014 Daybreak Oil & Gas Inc., Spokane, Wash., has drilled the first well in its 20-well development drilling program for the 2014-15 fiscal year at ...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected