Poland

By OGJ editors
HOUSTON, Mar. 1
– Aurelian Oil & Gas PLC let an engineering, procurement and construction management contract to ILF Consulting Engineers, Warsaw, for a pilot central production facility to treat gas from its Siekierki tight gas project near Poznan in west-central Poland.

The contract, awarded through Aurelian’s 90% owned Polish unit Energia Zachod, covers facilities designed to produce and treat as much as 11 MMscfd of gas that can be upgraded during full field development to a processing capacity of up to 106 MMscfd.

Gas sales should start from the first two Siekierki horizontal wells in the second half of 2011. Aurelian’s vertical Trzek-1 well flowed 7.5 MMscfd in 2007 from a Permian Rotliegendes sandstone below 3,000 m (OGJ Online, July 16, 2007). Trzek-2, a vertical hole with a sidetrack 1,500 m back towards Trzek-1, is to spud in June 2010.

Related Articles

API notes 23.1% rise in US drilling outlays in 2012

12/27/2013 Oil and gas producers spent an estimated $153.7 billion to drill US wells in 2012, 23.1% more than in 2011, the American Petroleum Institute said i...

Contact hails Kakwa Montney tight gas-liquids well results

10/16/2013 Contact Exploration Inc., Calgary, said completion of its fourth operated horizontal Middle Montney formation tight gas-liquids well extends the sc...

PIRA: Shale production growth makes US largest liquids producer

10/16/2013 US total oil supply is expected to average 12.1 million b/d this year, making it the world’s largest oil producer, PIRA Energy Group, an energy mar...

Energy exports highlight EIA conference, House subcommittee hearing

06/19/2013 Congress may be ready to discuss US LNG exports as soon as this summer, but won’t likely consider domestic petroleum sales to foreign countries for...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected