Peru

By OGJ editors
HOUSTON, Oct. 14
-- CEPSA Peru SA started a 2D seismic shoot in 2.4 million acre Block 127 in Peru's Maranon basin.

The company will collect 255 line-km and 135 line-km in the northeastern and southeastern parts of the block, respectively. An exploratory drilling likely will be made in first quarter 2010.

The closest part of the seismic program is 6 km west of 10-million-bbl Chambire Este oil field, which is connected to the Trans-Andean pipeline.

Under a farmout with Loon Energy Corp., Calgary, CEPSA will pay the first $10.75 million of exploration expenditures, after which each party will pay its respective share. Loon Energy holds 20% interest in the block.

Related Articles

Kentucky: Daybreak begins 2014 drilling campaign

03/28/2014 Daybreak Oil & Gas Inc., Spokane, Wash., has drilled the first well in its 20-well development drilling program for the 2014-15 fiscal year at ...

Egypt: IPR finds oil, gas in Southwest Gebel El-Zeit prospect

03/07/2014 Irving, Tex., independent IPR Inc. has made a discovery in its first drilled well, SWGEZ-5, in its Southwest Gebel El-Zeit concession in the Gulf o...

Guatemala: Atzam oil project advances

03/07/2014 Latin American Resources Ltd. (LAR) has drilled to 1,250 ft and successfully set and cemented the first intermediate 13.375-in. casing string in th...

Lundin completes Barents Sea exploration well

02/21/2014 Lundin Petroleum AB reported through its subsidiary, Lundin Norway AS, that it has completed drilling of its 7222/11-2 well on the Langlitinden pro...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected