Imperial Oil Ltd. awarded Fluor Corp. a $1.5 billion engineering, procurement, and construction contract for infrastructure and offlease facilities for the first phase of the Kearl oil sands project, a surface mining and bitumen extraction operation about 70 km northeast of Fort McMurray, Alta.