Gulfsands to develop Khurbet East in Syria

Uchenna Izundu
International Editor

LONDON, June 7 -- Gulfsands Petroleum PLC, London, has suspended for future production the Khurbet East-1 discovery well on Block 26 in Syria after conducting a drillstem test (OGJ Online, Mar. 28, 2007).

During the test, the well flowed 35º gravity oil to the surface at the rate of 478 b/d from a 102-m interval of Triassic Kurrachine dolomite at 3,098 m, the deepest of four reservoirs indicating hydrocarbons. GOR was 2 Mscf/bbl.

Gulfsands said wireline logs in the discovery well indicated 26.4 m of net oil pay in Cretaceous Chilou at 1,319 m and 22.5 m of net oil pay in Cretaceous Massive at 1,917 m. The company also cored 16 m of net pay in Tertiary Butmah at 2,850 m and recovered natural gas.

It refrained from testing the shallower zones in order to preserve mechanical integrity of the well for production.

Gulfsands, operator with a 50% interest in the block, will drill the Khurbet East-2 appraisal well immediately to test Cretaceous and Tertiary targets.

It plans to shoot a 3D seismic survey over the Khurbet East structure, a large fault-bound structural culmination with closure mapped at multiple intervals. Areal extent is 15 sq km at the level of the Kurrachine dolomite formation.

The discovery well is 12 km southwest of Souedieh oil field and 12 km south of Roumelan oil field. Development can use existing infrastructure.

Emerald Energy PLC, London, holds the remaining 50% interest in the block through its SNG Overseas subsidiary.

Contact Uchenna Izundu at uchennai@pennwell.com.

Related Articles

Baker Hughes: US drilling rig count drops to 1,803

03/21/2014 After consecutive weeks of significant gains, the US drilling rig count lost 6 units to 1,803 rigs working during the week ended Mar. 21, Baker Hug...

Cenovus gets AER approval for Grand Rapids oil sands project

03/21/2014 Cenovus Energy Inc. reported that it has received approval from the Alberta Energy Regulator (AER) for its wholly owned Grand Rapids thermal oil sa...

Shell lets contracts for Majnoon development

03/18/2014 Shell Iraq Petroleum Development BV has let engineering and procurement services contracts to Foster Wheeler Kentz Energy Services DMCC, Dubai, for...

Ivanhoe halts Tamarack oil sands project citing lack of regulatory ‘clarity’

03/18/2014 Ivanhoe Energy Inc. has suspended activity on its Tamarack oil sands project pending approval for its thermal oil sands application from the govern...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected