ConocoPhillips to resume Algeria field production

By OGJ editors
HOUSTON, June 29 -- ConocoPhillips, operator of Algeria's Menzel Lejmat North (MLN) field on Block 405a in the Berkine basin, plans to resume oil production from that field by the end of the third quarter, reported Talisman Energy Inc., a 35%-interest partner.

Field production has been halted due to damage of a gas reinjection compressor motor after a high-voltage surge caused the reinjection motor rotor ring to rupture. The motor has been shipped to France for repair.

Meanwhile, field maintenance and second phase compression preparatory work are under way.

Talisman's first quarter oil production from MLN averaged 11,591 b/d net.

Related Articles

ConocoPhillips reports higher 2013 earnings

02/10/2014 ConocoPhillips reported full-year earnings of $9.2 billion in 2013, an increase from the $8.4 billion totaled in 2012, which included $1.2 billion ...

ConocoPhillips reports higher 2013 earnings, expects higher production in 2014

01/31/2014 ConocoPhillips reported full-year earnings of $9.2 billion in 2013, an increase from the $8.4 billion totaled in 2012, which included $1.2 billion ...

Alaska LNG Project parties sign heads of agreement

01/16/2014 ExxonMobil Corp., BP PLC, ConocoPhillips, TransCanada Corp., Alaska Gasline Development Corp. (AGDC), and Alaska’s commissioners of natural resourc...

ConocoPhillips closes $1.75 billion sale of Algeria business

11/27/2013 ConocoPhillips completed the sale of its Algeria business unit ConocoPhillips Algeria Ltd. to Indonesian state-owned Pertamina for $1.75 billion, r...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected