Tsakos takes delivery of VLCC

By OGJ editors
HOUSTON, Jan. 27 -- Tsakos Energy Navigation Ltd. has taken delivery of the 298,900 dwt double-hull very large crude carrier (VLCC) La Prudencia built in 1993. The vessel has been immediately employed by a major oil company for a 50-day voyage.

La Prudencia is the first delivery in a five-vessel acquisition program that includes construction of two 1B ice-class product carriers, which are scheduled for delivery in the second and third quarters of 2007; a second-hand double-hull product tanker, which is on time charter until September; and a 105,000 dwt Aframax tanker being built by Sumitomo Heavy Industries Ltd., Japan, and is scheduled for delivery in the second half of 2008.

Tsakos will take delivery later this quarter of the 37,532 dwt product tanker Delphi built in 2004.

Related Articles

USCG proposes higher offshore oil spill liability limits

08/25/2014 The US Coast Guard proposed higher offshore oil spill liability limits under the 1990 Oil Pollution Act to reflect significant increases in the Con...

USCG proposes higher offshore oil spill liability limits

08/20/2014 The US Coast Guard proposed higher offshore oil spill liability limits under the 1990 Oil Pollution Act to reflect significant increases in the Con...

Post-construction infield lining rehabs subsea pipelines

08/04/2014

Petronas Carigali (PCSB) owns and operates an extensive network of subsea pipelines off Malaysia in the South China Sea.

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected