Malaysia LNG Dua Sdn. Bhd. (MLNG Dua) has awarded a contract to Foster Wheeler E&C Malaysia Sdn. Bhd. and partner OGP Technical Services Sdn. Bhd. for the front-end engineering design and engineering, procurement, and construction phases of a debottleneck project at the MLNG Dua LNG facility at Bintulu, East Malaysia.