Foster Wheeler to design BP delayed coker

By OGJ editors
HOUSTON, Aug. 25 -- BP Oil Refineria de Castellon SA, a unit of BP PLC, let a contract to Foster Wheeler USA Corp. to supply a process design package for a 20,000 b/sd delayed coking plant in Spain. The contract's value was withheld.

The delayed coker, scheduled for completion in second quarter 2008, is part of BP's $100 million reconfiguration of its 120,000 b/sd refinery at Castellon de la Plana, Spain (OGJ Online, July 15, 2002).

Foster Wheeler, Clinton, NJ, will provide proprietary delayed coking technology.

Related Articles

Rosneft advances hydrotreating complex at Syzran refinery

08/29/2014 OAO Rosneft has received a reactor and cold high-pressure separator to be used in the construction of a planned diesel hydrotreating complex at its...

Damaged unit weighs on diesel output at Porvoo refinery

08/29/2014 Repairs remain under way on a damaged hydrogen production unit at Neste Oil Corp.’s 205,000-b/d Porvoo refinery in the Kilpilahti Industrial Area, ...

PDVSA shuts refinery generator for maintenance

08/29/2014 Petroleos de Venezuela SA (PDVSA) has shut down the power generation system that supplies its 190,000-b/d Puerto La Cruz refinery in eastern Venezu...

BP confirms fire at Whiting refinery

08/28/2014 An overnight fire at BP PLC’s 413,000-b/d refinery in Whiting, Ind., has resulted in only minimal interruptions to operations at the site, the comp...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected