Apache makes two discoveries in Egypt

By OGJ editors

HOUSTON, Apr. 7 -- Apache Corp., Houston, has made two new oil and gas discoveries in Egypt: The Syrah 1X wildcat, on the Khalda Offset concession, flow-tested at a rate of 46.5 MMcfd of natural gas; and the Tanzanite 1X discovery, on Apache's onshore West Mediterranean concession, flow-tested at 5,296 b/d of oil and 7.4 MMcfd of gas.

Syrah 1X
The 2 million-acre Khalda concession, which Apache operates with a 100% contractor interest, is located 250 miles west of Cairo and contains 25 other discovered oil and gas fields (see map, OGJ, Nov. 8, 2004, p. 34).

Syrah 1X, completed in the Jurassic Lower Safa formation, was drilled to 14,445 ft TD and perforated between 13,750 ft and 13,905 ft in a Jurassic fault block separate and down-dip from world-class Qasr Jurassic field and overlain by a four-way dip closure at the Cretaceous Alam el Bueib (AEB) 3D formation. It was tested through a 48/64-in. choke with 3,980 psi of flowing wellhead pressure.

Syrah 1X logged 266 ft of net pay from Cretaceous to Jurassic horizons between 11,400 ft and 13,918 ft. The thickest pay—174 ft between 13,744 ft and 13,918 ft—is in the Lower Safa and is stratigraphically similar to Qasr field, which is one of the two largest gas fields in Egypt's Western Desert and Apache's largest discovery to date (OGJ Online, July 12, 2004). Syrah 1X also logged 32 ft of net pay in the Jurassic Upper Safa and 60 ft of potential oil pay in AEB sands.

Pressure analysis indicates that the AEB 3E pay may be in communication with Qasr and Ozoris fields 3 miles to the south.

The Syrah well's structural-stratigraphic trap in the Jurassic Lower Safa encompasses a 606-ft hydrocarbon column over a potential area of more than 4,000 acres.

"The Syrah 1X Jurassic discovery is a separate closure 3.3 miles northwest of Qasr field which, with estimated reserves of 2 tcf of gas and 45 million bbl of condensate, is the largest discovery in Apache's history," said Rodney J. Eichler, Apache's executive vice-president in charge of Egyptian operations. "Delineation of the structure will take additional wells, but seismically, the Syrah field is potentially at least one-quarter the size of Qasr. That would rank the new-field discovery the third-largest Jurassic gas field found to date in the Western Desert."

Apache plans to produce Syrah's gas through its new Qasr field production facility starting this summer, adding to the company's present Western Desert gross production of 300 MMcfd of gas. Apache has contracts that will more than double its Western Desert production to 637 MMcfd of gas, as additional processing capacity comes on line over the next several years. The rig that drilled the discovery has moved southwest 0.2 of a mile to drill the Syrah 2, targeting oil pays in the AEB.

Tanzanite 1X
On Apache's onshore West Mediterranean concession, the Tanzanite 1X discovery was tested through on a 1-in. choke with 814 psi of flowing wellhead pressure from 13 ft of perforations in the AEB 3A sandstone. The well logged a combined 207 ft of net pay from several Cretaceous horizons between 8,670 ft and 11,560 ft.

The Tanzanite 1X was drilled to 12,440 ft TD to test a seismically defined four-way dip closure 1.7 miles southeast of North Alamein field and production facilities.

The well will be connected to North Alamein's processing facilities. Apache will begin production following Egyptian General Petroleum Corp.'s approval of a development lease. Apache holds a 65% contractor interest in the concession and RWE DEA AG, Hamburg, 35%.

Apache will drill the Tanzanite 2 appraisal well 0.4 of a mile northeast of the Tanzanite 1X surface location to test the Alamein Dolomite. The well will be designed to test and produce the overlying Kharita and Dahab reservoirs at this updip location.

Related Articles

KMI brings second Texas condensate splitter online

07/15/2015 Kinder Morgan Inc., Houston, has commissioned the second of two splitters at the company’s new petroleum condensate processing facility located nea...

Rosneft, Statoil drill two horizontal wells in pilot at North Komsomolskoye

07/14/2015 OAO Rosneft and Statoil ASA have jointly drilled two horizontal exploitation wells in the PK1 layer of North Komsomolskoye field, Rosneft reported.

A true legacy

07/13/2015

The art of saying farewell-much like the mastery of OGJ style-can be a tricky undertaking.

Chevron Phillips Chemical makes executive appointments

07/10/2015

Chevron Phillips Chemical Co. LLC has made several executive appointments, all effective Aug. 1.

MOL completes Ithaca Norge acquisition

07/09/2015 MOL Group, Budapest, has completed its acquisition of Ithaca Petroleum Norge from Ithaca Energy Inc. for $60 million plus possible bonuses of up to...

Stone confirms oil pay with Cardona development well in deepwater gulf

07/08/2015 Stone Energy Corp., Lafayette, La., encountered 288 ft of net pay in two intervals with its Cardona No. 6 development well on Mississippi Canyon Bl...

WAFWA: Aerial survey finds lesser prairie chicken population grew

07/06/2015 A recent range-wide aerial survey found the lesser prairie chicken population rose 25% from 2014 to 2015, the Western Association of Fish & Wil...

Buru awarded onshore Canning licenses

07/06/2015 Buru Energy Ltd., Perth, and Mitsubish Corp. have been granted two production licenses for Ungani oil field in the onshore Canning basin of Western...

Earth model assists Permian asset valuation

07/06/2015 Laredo Petroleum Inc.'s Permian-Garden City asset is an unconventional resource play with more than four potential stacked zones covering a 1,700 s...
White Papers

2015 Global Engineering Information Management Solutions Competitive Strategy Innovation and Leadership Award

The Frost & Sullivan Best Practices Awards recognise companies in a variety of regional and global...
Sponsored by

Three Tips to Improve Safety in the Oil Field

Working oil fields will always be tough work with inherent risks. There’s no getting around that. Ther...
Sponsored by

Pipeline Integrity: Best Practices to Prevent, Detect, and Mitigate Commodity Releases

Commodity releases can have catastrophic consequences, so ensuring pipeline integrity is crucial for p...
Sponsored by

AVEVA’s Digital Asset Approach - Defining a new era of collaboration in capital projects and asset operations

There is constant, intensive change in the capital projects and asset life cycle management. New chall...
Sponsored by

Transforming the Oil and Gas Industry with EPPM

With budgets in the billions, timelines spanning years, and life cycles extending over decades, oil an...
Sponsored by

Asset Decommissioning in Oil & Gas: Transforming Business

Asset intensive organizations like Oil and Gas have their own industry specific challenges when it com...
Sponsored by

Squeezing the Green: How to Cut Petroleum Downstream Costs and Optimize Processing Efficiencies with Enterprise Project Portfolio Management Solutions

As the downstream petroleum industry grapples with change in every sector and at every level, includin...
Sponsored by

7 Steps to Improve Oil & Gas Asset Decommissioning

Global competition and volatile markets are creating a challenging business climate for project based ...
Sponsored by
Available Webcasts

On Demand

OGJ's Midyear Forecast 2015

Fri, Jul 10, 2015

This webcast is to be presented by OGJ Editor Bob Tippee and Senior Economic Editor Conglin Xu.  They will summarize the Midyear Forecast projections in key categories, note important changes from January’s forecasts, and examine reasons for the adjustments.

register:WEBCAST


Predictive Analytics in your digital oilfield - Optimize Production Yield and Reduce Operational Costs

Tue, Jul 7, 2015

Putting predictive analytics to work in your oilfield can help you anticipate failures, plan and schedule work in advance, eliminate emergency work and catastrophic failures, and at the same time you can optimize working capital and improve resource utilization.  When you apply analytic capabilities to critical production assets it is possible to reduce non-productive time and increase your yield.

Learn how IBM's analytics capabilities can be applied to critical production assets with the goal of reducing non-productive time, increasing yield and reducing operations costs.

register:WEBCAST


Cognitive Solutions for Upstream Oil and Gas

Fri, Jun 12, 2015

The oil & gas sector is under pressure on all sides. Reserves are limited and it’s becoming increasingly expensive to find and extract new resources. Margins are already being squeezed in an industry where one wrong decision can cost millions. Analyzing data used in energy exploration can save millions of dollars as we develop ways to predict where and how to extract the world’s massive energy reserves.

This session with IBM Subject Matter Experts will discuss how IBM Cognitive Solutions contribute to the oil and gas industry using predictive analytics and cognitive computing, as well as real time streaming for exploration and drilling.

register:WEBCAST


The Alternative Fuel Movement: Four Need-to-Know Excise Tax Complexities

Thu, Jun 4, 2015

Discussion on how to approach, and ultimately embrace, the alternative fuel market by pulling back the veil on excise tax complexities. Taxes may be an aggravating part of daily operations, but their accuracy is crucial in your path towards business success.

register:WEBCAST


Emerson Micro Motion Videos

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected