The US Federal Energy Regulatory Commission has approved construction of the 2.6 bcfd LNG regasification terminal proposed in Cameron Parish, La., by Sabine Pass LNG LP, a unit of Cheniere Energy Inc., Houston.
FERC also approved construction of a 26-mile pipeline connecting the LNG terminal to an existing gas pipeline.