Hydraulic analysis key to effective, low-cost demethanizer debottleneck

Click on the pdf link below to view the entire article.

A hydraulic analysis successfully identified a bottleneck in a demethanizer column at Eastman Chemical Co.'s Longview, Tex., olefins plant.

Related Articles

ORPIC lets contract for ethylene plant

03/31/2014 Oman Oil Refineries & Petroleum Industries Co. (ORPIC) has let a contract to CB&I to provide ethylene technology and front-end engineering ...

Ethane supply secured for proposed W.Va. ethylene cracker

03/28/2014 Brazil-based Odebrecht SA subsidiary Odebrecht Oil & Gas SA has let a contract to Antero Resources Inc. to become the anchor ethane supplier fo...

Ineos lets contract for Grangemouth ethane terminal

03/28/2014 Ineos Europe AG, Switzerland, said it has reached the latest milestones in its $500 million survival plan to import US shale gas to its 210,000-b/d...

Petronas progresses on RAPID project

03/27/2014 BMT Asia-Pacific Pte. Ltd. (BMT), a subsidiary of BMT Group Ltd., has completed a concept design for the material offloading facility (MOLF) at sta...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected