Hydraulic analysis key to effective, low-cost demethanizer debottleneck

Click on the pdf link below to view the entire article.

A hydraulic analysis successfully identified a bottleneck in a demethanizer column at Eastman Chemical Co.'s Longview, Tex., olefins plant.

Related Articles

Williams CEO details regulatory hurdles, growth strategy

10/13/2014 Crude oil and natural gas pipeline systems in the US are growing at a very rapid pace as new infrastructure is introduced in an effort to optimize ...

Study for offshore Mideast field proves inhibitor, sulfur solvent compatible

10/06/2014 Elemental sulfur in the produced gas from Hasbah gas field in the Arabian Gulf off Saudi Arabia raised concerns about flow assurance and corrosion.

Petronas lets contract for RAPID steam cracker

10/03/2014 Malaysia’s state-owned Petronas, through a contractor, has let a contract to CB&I for the engineering and supply of ethylene heaters for its re...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected