New methods for CP design offered

Click on the pdf link below to view entire article.


Two new methods for designing pipeline cathodic-protection systems employ newly developed CP design software for marine pipelines.

Related Articles

Antero books all of TGP gas pipeline expansion capacity

04/14/2014 Antero Resources Inc. was awarded all of the natural gas capacity offered by Kinder Morgan Energy Partners LP’s Tennessee Gas Pipeline Co. (TGP) in...

Heitkamp leads Senate Democrats’ new push for Keystone XL approval

04/10/2014 Ten other US Senate Democrats joined Heidi Heitkamp (ND) in urging US President Barack Obama to approve the proposed Keystone XL crude oil pipeline...

AMP files FERC request for abandonment of Midla Pipeline

04/03/2014 American Midstream Partners LP (AMP) has filed a request with the US Federal Energy Regulatory Commission to abandon use of its 1920s vintage Midla...

Senate Republicans introduce energy amendment to jobs bill

04/02/2014 Three Republican members of the US Senate Energy and Natural Resources Committee introduced legislation that would approve the Keystone XL crude oi...

Careers at TOTAL

Careers at TOTAL - Videos

More than 600 job openings are now online, watch videos and learn more!

 

Click Here to Watch

Other Oil & Gas Industry Jobs

Search More Job Listings >>
Stay Connected