A unit of the Royal Dutch/Shell Group will launch a pilot water injection project in Greater Sirikit field on S1 concession in early 2002. During 2001, the field suffered a rapid drop in pressure. Thai Shell will decide in mid-2002 whether to commit to a full-scale water injection program.